OH / Troy
OH · EV charging
EV charging in Troy, OH
Here is what NREL's public data shows about EV charging in Troy, OH. As of NREL AFDC data retrieved July 2026, Troy has 11 public charging stations with 32 Level 2 ports, including 5 DC fast-charging ports for quick top-ups.
DC fast Level 2 not recently confirmed · click a marker for details, directions & Street View
- 11Public stations
- 32Level 2 ports
- 5DC fast ports
- 14%Ports that are DC fast
⚡ 2 stations list free charging
Stations are operated across 6 networks: Blink Network (4), Non-networked (2), ChargePoint Network (2), EV Connect (1), and 2 more.
Connectors on record: J1772 (Level 2) at 10 stations; CCS (J1772 Combo) at 2 stations.
Of these stations, 2 list free charging, per NREL's pricing field. Pricing is not recorded for the remaining 9. Always confirm current pricing with the network before you charge.
Notable charging stations
The largest sites by port count, DC fast first. Troy has 11 public stations in all — see the map above.
| Station | Network | Charging | Confirmed |
|---|---|---|---|
| Meijer Troy, OH #112 1900 W. Main St. | eVgo Network | DC fast 4 DC fast · CCS (J1772 Combo) | July 2026 |
| Dave Arbogast Buick-GMC 3540 S COUNTY RD 25A | EV Connect | DC fast 1 DC fast + 1 Level 2 · J1772 (Level 2), CCS (J1772 Combo) | July 2026 |
| American Honda Motor Co, Inc 151 Commerce Center Blvd | AMPUP | 12 Level 2 · J1772 (Level 2) | August 2025 |
| Kettering Health Troy 600 West Main Street | Blink Network | 4 Level 2 · J1772 (Level 2) | July 2026 |
| Chevrolet Of Troy 1375 S Market St | Non-networked | 3 Level 2 · J1772 (Level 2) | July 2026 |
| AAA Tire and Auto Service Troy 4 South Stanfield Road | Blink Network | 2 Level 2 · J1772 (Level 2) | July 2026 |
| Kettering Troy Hospital 600 W Main St | Non-networked | 2 Level 2 · J1772 (Level 2) | July 2026 |
| BNC RIGHT 5995 Horseshoe Bend Rd | ChargePoint Network | 2 Level 2 · J1772 (Level 2) | July 2026 |
| BNC LEFT 5995 Horseshoe Bend Rd | ChargePoint Network | 2 Level 2 · J1772 (Level 2) | July 2026 |
| MVRPC(EV#33) 2385 State Route 41 | Blink Network | 2 Level 2 · J1772 (Level 2) | July 2026 |
Spotted something out of date or missing? Report a correction.
What this means
Level 2 is the standard public and home charger (240V) — a few hours for a full charge, fine for shopping, work, or overnight. DC fast charging is the highway kind: 20–40 minutes to most of a charge, but not every station has it.
Connectors are the plug shape. J1772 is the universal Level 2 plug almost every non-Tesla EV uses. CCS and CHAdeMO are DC fast-charging plugs (CHAdeMO is older, mostly older Nissan Leafs). NACS is Tesla's plug, now the emerging US standard — many newer non-Teslas use it or an adapter.
This page summarizes NREL's own station records and is not a live availability map — a charger listed here can still be busy, broken, or behind a gate. Check the network's app before you rely on a specific plug.
Charging at home in Troy?
Most EV owners do the bulk of their charging overnight at home on a Level 2 charger. See our home EV charger buying guide for what to look for and how to match a charger to your car's connector.
EV charging near Troy
Source: U.S. DOE / NREL Alternative Fuels Data Center (AFDC) Station Locator, retrieved July 2026. Public stations only.