OH / Upper Arlington
OH · EV charging
EV charging in Upper Arlington, OH
Here is what NREL's public data shows about EV charging in Upper Arlington, OH. As of NREL AFDC data retrieved July 2026, Upper Arlington has 7 public charging stations with 9 Level 2 ports, including 2 DC fast-charging ports for quick top-ups.
DC fast Level 2 not recently confirmed · click a marker for details, directions & Street View
- 7Public stations
- 9Level 2 ports
- 2DC fast ports
- 18%Ports that are DC fast
⚡ 1 station lists free charging
Stations are operated across 2 networks: ChargePoint Network (6), Non-networked (1).
Connectors on record: J1772 (Level 2) at 5 stations; CHAdeMO at 2 stations; CCS (J1772 Combo) at 2 stations.
Of these stations, 1 list free charging, per NREL's pricing field. Pricing is not recorded for the remaining 6. Always confirm current pricing with the network before you charge.
Notable charging stations
The largest sites by port count, DC fast first. Upper Arlington has 7 public stations in all — see the map above.
| Station | Network | Charging | Confirmed |
|---|---|---|---|
| CITY OF UA MSC TREMONT RD2 3600 Tremont Road | ChargePoint Network | DC fast 1 DC fast · CHAdeMO, CCS (J1772 Combo) | July 2026 |
| CITY OF UA MSC TREMONT RD1 3600 Tremont Road | ChargePoint Network | DC fast 1 DC fast · CHAdeMO, CCS (J1772 Combo) | July 2026 |
| 3360TREMONTROAD EYESEVC@5POINTS 3360 Tremont Rd | ChargePoint Network | 2 Level 2 · J1772 (Level 2) | July 2026 |
| UPPER ARLINGTON LANE AVE MOB 1 1480 W Lane Ave | ChargePoint Network | 2 Level 2 · J1772 (Level 2) | July 2026 |
| UPPER ARLINGTON LANE AVE MOB 2 1480 W Lane Ave | ChargePoint Network | 2 Level 2 · J1772 (Level 2) | July 2026 |
| LAZ PARKING COL KINGSDALE 1 3181 Northwest Blvd | ChargePoint Network | 2 Level 2 · J1772 (Level 2) | July 2026 |
| Whole Foods Market 1555 W Lane Ave | Non-networked | 1 Level 2 · J1772 (Level 2) | July 2025 |
Spotted something out of date or missing? Report a correction.
What this means
Level 2 is the standard public and home charger (240V) — a few hours for a full charge, fine for shopping, work, or overnight. DC fast charging is the highway kind: 20–40 minutes to most of a charge, but not every station has it.
Connectors are the plug shape. J1772 is the universal Level 2 plug almost every non-Tesla EV uses. CCS and CHAdeMO are DC fast-charging plugs (CHAdeMO is older, mostly older Nissan Leafs). NACS is Tesla's plug, now the emerging US standard — many newer non-Teslas use it or an adapter.
This page summarizes NREL's own station records and is not a live availability map — a charger listed here can still be busy, broken, or behind a gate. Check the network's app before you rely on a specific plug.
Charging at home in Upper Arlington?
Most EV owners do the bulk of their charging overnight at home on a Level 2 charger. See our home EV charger buying guide for what to look for and how to match a charger to your car's connector.
EV charging near Upper Arlington
Source: U.S. DOE / NREL Alternative Fuels Data Center (AFDC) Station Locator, retrieved July 2026. Public stations only.