OH / Willoughby
OH · EV charging
EV charging in Willoughby, OH
Here is what NREL's public data shows about EV charging in Willoughby, OH. As of NREL AFDC data retrieved July 2026, Willoughby has 10 public charging stations with 12 Level 2 ports, including 10 DC fast-charging ports for quick top-ups.
DC fast Level 2 not recently confirmed · click a marker for details, directions & Street View
- 10Public stations
- 12Level 2 ports
- 10DC fast ports
- 45%Ports that are DC fast
Stations are operated across 2 networks: ChargePoint Network (9), IONNA (1).
Connectors on record: J1772 (Level 2) at 9 stations; CCS (J1772 Combo) at 1 station; NACS / Tesla at 1 station.
1 station carries a NACS / Tesla connector — relevant if you drive a Tesla or a newer EV that has switched to NACS.
Notable charging stations
The largest sites by port count, DC fast first. Willoughby has 10 public stations in all — see the map above.
| Station | Network | Charging | Confirmed |
|---|---|---|---|
| Willoughby, OH Rechargery @ Sheetz - OH 306 4145 OH 306 | IONNA | DC fast 10 DC fast · CCS (J1772 Combo), NACS / Tesla | July 2026 |
| LEIKIN MOTOR CO GUEST PARKING 38767 Mentor Ave | ChargePoint Network | 2 Level 2 · J1772 (Level 2) | July 2026 |
| WILLOUGHBY STATION1 1 East Spaulding St, Willoughby, OH 44094 | ChargePoint Network | 2 Level 2 · J1772 (Level 2) | July 2026 |
| WILLOUGHBY STATION2 1 East Spaulding St, Willoughby, OH 44094 | ChargePoint Network | 2 Level 2 · J1772 (Level 2) | July 2026 |
| CRW3 CENTRAL STATION 2B 38501 Mentor Ave | ChargePoint Network | 1 Level 2 · J1772 (Level 2) | July 2026 |
| CRW3 CENTRAL STATION 2A 38501 Mentor Ave | ChargePoint Network | 1 Level 2 · J1772 (Level 2) | July 2026 |
| CRW3 CENTRAL STATION 1A 38401 Mentor Ave | ChargePoint Network | 1 Level 2 · J1772 (Level 2) | July 2026 |
| CRW3 CENTRAL STATION 1B 38401 Mentor Ave | ChargePoint Network | 1 Level 2 · J1772 (Level 2) | July 2026 |
| CRW3 CENTRAL STATION 3B 38501 Mentor Ave | ChargePoint Network | 1 Level 2 · J1772 (Level 2) | July 2026 |
| CRW3 CENTRAL STATION 3A 38501 Mentor Ave | ChargePoint Network | 1 Level 2 · J1772 (Level 2) | July 2026 |
Spotted something out of date or missing? Report a correction.
What this means
Level 2 is the standard public and home charger (240V) — a few hours for a full charge, fine for shopping, work, or overnight. DC fast charging is the highway kind: 20–40 minutes to most of a charge, but not every station has it.
Connectors are the plug shape. J1772 is the universal Level 2 plug almost every non-Tesla EV uses. CCS and CHAdeMO are DC fast-charging plugs (CHAdeMO is older, mostly older Nissan Leafs). NACS is Tesla's plug, now the emerging US standard — many newer non-Teslas use it or an adapter.
This page summarizes NREL's own station records and is not a live availability map — a charger listed here can still be busy, broken, or behind a gate. Check the network's app before you rely on a specific plug.
Charging at home in Willoughby?
Most EV owners do the bulk of their charging overnight at home on a Level 2 charger. See our home EV charger buying guide for what to look for and how to match a charger to your car's connector.
EV charging near Willoughby
Source: U.S. DOE / NREL Alternative Fuels Data Center (AFDC) Station Locator, retrieved July 2026. Public stations only.