OK / Edmond
OK · EV charging
EV charging in Edmond, OK
Here is what NREL's public data shows about EV charging in Edmond, OK. As of NREL AFDC data retrieved July 2026, Edmond has 24 public charging stations with 36 Level 2 ports, including 36 DC fast-charging ports for quick top-ups.
DC fast Level 2 not recently confirmed · click a marker for details, directions & Street View
- 24Public stations
- 36Level 2 ports
- 36DC fast ports
- 50%Ports that are DC fast
⚡ 1 station lists free charging
Stations are operated across 6 networks: ChargePoint Network (18), FCN (2), Blink Network (1), eVgo Network (1), and 2 more.
Connectors on record: J1772 (Level 2) at 16 stations; CCS (J1772 Combo) at 7 stations; CHAdeMO at 5 stations; NACS / Tesla at 1 station.
Of these stations, 1 list free charging, per NREL's pricing field. Pricing is not recorded for the remaining 23. Always confirm current pricing with the network before you charge.
1 station carries a NACS / Tesla connector — relevant if you drive a Tesla or a newer EV that has switched to NACS.
Notable charging stations
The largest sites by port count, DC fast first. Edmond has 24 public stations in all — see the map above.
| Station | Network | Charging | Confirmed |
|---|---|---|---|
| Edmond, OK - Tesla Supercharger 3325 S Blvd | Tesla | DC fast 12 DC fast · NACS / Tesla | June 2026 |
| University Plaza 1200 E 2nd St | FCN | DC fast 8 DC fast · CHAdeMO, CCS (J1772 Combo) | July 2026 |
| Crest - Edmond 2200 W 15th St | FCN | DC fast 8 DC fast · CHAdeMO, CCS (J1772 Combo) | July 2026 |
| Flying J 704 4801 NE 122nd St | eVgo Network | DC fast 4 DC fast · CCS (J1772 Combo) | July 2026 |
| GENESISOFEDMOND GOE1 14113 North Kelley Avenue | ChargePoint Network | DC fast 1 DC fast · CHAdeMO, CCS (J1772 Combo) | July 2026 |
| GENESISOFEDMOND GOE2 14113 N Kelley Ave | ChargePoint Network | DC fast 1 DC fast · CHAdeMO, CCS (J1772 Combo) | July 2026 |
| GENESISOFEDMOND GOE3 14113 N Kelley Ave | ChargePoint Network | DC fast 1 DC fast · CHAdeMO, CCS (J1772 Combo) | July 2026 |
| GENESISOFEDMOND GOE4 14113 N Kelley Ave | ChargePoint Network | DC fast 1 DC fast · CCS (J1772 Combo) | July 2026 |
| Silos OKC 100 W. Main Steet | CHARGELAB | 6 Level 2 · J1772 (Level 2) | July 2026 |
| EDMONDOK MITCH PARK 1501 W Covell Rd | ChargePoint Network | 2 Level 2 · J1772 (Level 2) | July 2026 |
Spotted something out of date or missing? Report a correction.
What this means
Level 2 is the standard public and home charger (240V) — a few hours for a full charge, fine for shopping, work, or overnight. DC fast charging is the highway kind: 20–40 minutes to most of a charge, but not every station has it.
Connectors are the plug shape. J1772 is the universal Level 2 plug almost every non-Tesla EV uses. CCS and CHAdeMO are DC fast-charging plugs (CHAdeMO is older, mostly older Nissan Leafs). NACS is Tesla's plug, now the emerging US standard — many newer non-Teslas use it or an adapter.
This page summarizes NREL's own station records and is not a live availability map — a charger listed here can still be busy, broken, or behind a gate. Check the network's app before you rely on a specific plug.
Charging at home in Edmond?
Most EV owners do the bulk of their charging overnight at home on a Level 2 charger. See our home EV charger buying guide for what to look for and how to match a charger to your car's connector.
EV charging near Edmond
Source: U.S. DOE / NREL Alternative Fuels Data Center (AFDC) Station Locator, retrieved July 2026. Public stations only.