ChargingAtlas

PA / Easton

PA · EV charging

EV charging in Easton, PA

Here is what NREL's public data shows about EV charging in Easton, PA. As of NREL AFDC data retrieved July 2026, Easton has 20 public charging stations with 42 Level 2 ports, including 16 DC fast-charging ports for quick top-ups.

DC fast   Level 2   not recently confirmed  ·  click a marker for details, directions & Street View

⚡ 4 stations list free charging

Stations are operated across 8 networks: ChargePoint Network (9), Blink Network (5), Non-networked (1), Tesla (1), and 4 more.

Connectors on record: J1772 (Level 2) at 16 stations; CCS (J1772 Combo) at 4 stations; CHAdeMO at 2 stations; NACS / Tesla at 1 station.

Of these stations, 4 list free charging and 1 are paid, per NREL's pricing field. Pricing is not recorded for the remaining 15. Always confirm current pricing with the network before you charge.

1 station carries a NACS / Tesla connector — relevant if you drive a Tesla or a newer EV that has switched to NACS.

Notable charging stations

The largest sites by port count, DC fast first. Easton has 20 public stations in all — see the map above.

StationNetworkChargingConfirmed
Easton, PA - Tesla Supercharger
100 Trolley Line Drive Building B1
Tesla DC fast 8 DC fast · NACS / Tesla June 2026
Easton Ford
3810 Hecktown Rd Suite D
RED_E DC fast 4 DC fast + 4 Level 2 · J1772 (Level 2), CCS (J1772 Combo) July 2026
Star GMC
260 COUNTRY CLUB RD
EV Connect DC fast 2 DC fast · CCS (J1772 Combo) July 2026
BDHDELIVERY CUSTOMER PRKNG
3901 Hecktown Road, Easton, (18045), PA
ChargePoint Network DC fast 1 DC fast · CHAdeMO, CCS (J1772 Combo) July 2026
BDHDELIVERY STATION1
3901 Hecktown Rd
ChargePoint Network DC fast 1 DC fast · CHAdeMO, CCS (J1772 Combo) July 2026
St. Lukes Hospital - Anderson Campus
1872 St. Luke's Blvd
Blink Network 6 Level 2 · J1772 (Level 2) July 2026
Hecktown Oaks Campus - South
3780 Hecktown Road
Blink Network 4 Level 2 · J1772 (Level 2) July 2026
Hecktown Oaks Campus - North
3780 Hecktown Road
Blink Network 4 Level 2 · J1772 (Level 2) July 2026
KOCH 33 TOYOTA SOUTH STATION
3816 Hecktown Rd
ChargePoint Network 2 Level 2 · J1772 (Level 2) July 2026
AAA Northampton County
3914 Hecktown Rd
Non-networked 2 Level 2 · J1772 (Level 2) July 2025

Spotted something out of date or missing? Report a correction.

What this means

Level 2 is the standard public and home charger (240V) — a few hours for a full charge, fine for shopping, work, or overnight. DC fast charging is the highway kind: 20–40 minutes to most of a charge, but not every station has it.

Connectors are the plug shape. J1772 is the universal Level 2 plug almost every non-Tesla EV uses. CCS and CHAdeMO are DC fast-charging plugs (CHAdeMO is older, mostly older Nissan Leafs). NACS is Tesla's plug, now the emerging US standard — many newer non-Teslas use it or an adapter.

This page summarizes NREL's own station records and is not a live availability map — a charger listed here can still be busy, broken, or behind a gate. Check the network's app before you rely on a specific plug.

Charging at home in Easton?

Most EV owners do the bulk of their charging overnight at home on a Level 2 charger. See our home EV charger buying guide for what to look for and how to match a charger to your car's connector.

EV charging near Easton

Source: U.S. DOE / NREL Alternative Fuels Data Center (AFDC) Station Locator, retrieved July 2026. Public stations only.