PA / Wayne
PA · EV charging
EV charging in Wayne, PA
Here is what NREL's public data shows about EV charging in Wayne, PA. As of NREL AFDC data retrieved July 2026, Wayne has 9 public charging stations with 20 Level 2 ports, all Level 2 (no DC fast charging on record).
DC fast Level 2 not recently confirmed · click a marker for details, directions & Street View
- 9Public stations
- 20Level 2 ports
- 0DC fast ports
- 0%Ports that are DC fast
⚡ 1 station lists free charging
Stations are operated across 3 networks: ChargePoint Network (7), Blink Network (1), Non-networked (1).
Connectors on record: J1772 (Level 2) at 8 stations; NEMA 14-50 (Level 2) at 1 station.
Of these stations, 1 list free charging, per NREL's pricing field. Pricing is not recorded for the remaining 8. Always confirm current pricing with the network before you charge.
Notable charging stations
The largest sites by port count, DC fast first. Wayne has 9 public stations in all — see the map above.
| Station | Network | Charging | Confirmed |
|---|---|---|---|
| NERO: VAFO Visitor Center Lower Lot 100 N Outer Line Dr | Non-networked | 4 Level 2 · NEMA 14-50 (Level 2) | December 2025 |
| BDN - 201 KOP 201 King of Prussia Rd | ChargePoint Network | 2 Level 2 · J1772 (Level 2) | July 2026 |
| DEVON DEVON OFFICE 744 W Lancaster Ave | ChargePoint Network | 2 Level 2 · J1772 (Level 2) | July 2026 |
| BDN - 150 RFC 1 & 2 150 N Radnor Chester Rd | ChargePoint Network | 2 Level 2 · J1772 (Level 2) | July 2026 |
| BRANDYWINE PA 201 KOP RD 201 King of Prussia Rd | ChargePoint Network | 2 Level 2 · J1772 (Level 2) | July 2026 |
| 480 Swedesford Associates Rd Building 480 Swedesford Road | Blink Network | 2 Level 2 · J1772 (Level 2) | July 2026 |
| RCC4 RCC4 STATION #1 4 N Centennial Dr | ChargePoint Network | 2 Level 2 · J1772 (Level 2) | July 2026 |
| 3RCC RCC3 #1 100 Matsonford Road RCC 3 | ChargePoint Network | 2 Level 2 · J1772 (Level 2) | July 2026 |
| MANE TECHNIQUES MANE TECHNIQUES 322 E Lancaster Ave | ChargePoint Network | 2 Level 2 · J1772 (Level 2) | July 2026 |
Spotted something out of date or missing? Report a correction.
What this means
Level 2 is the standard public and home charger (240V) — a few hours for a full charge, fine for shopping, work, or overnight. DC fast charging is the highway kind: 20–40 minutes to most of a charge, but not every station has it.
Connectors are the plug shape. J1772 is the universal Level 2 plug almost every non-Tesla EV uses. CCS and CHAdeMO are DC fast-charging plugs (CHAdeMO is older, mostly older Nissan Leafs). NACS is Tesla's plug, now the emerging US standard — many newer non-Teslas use it or an adapter.
This page summarizes NREL's own station records and is not a live availability map — a charger listed here can still be busy, broken, or behind a gate. Check the network's app before you rely on a specific plug.
Charging at home in Wayne?
Most EV owners do the bulk of their charging overnight at home on a Level 2 charger. See our home EV charger buying guide for what to look for and how to match a charger to your car's connector.
EV charging near Wayne
Source: U.S. DOE / NREL Alternative Fuels Data Center (AFDC) Station Locator, retrieved July 2026. Public stations only.