ChargingAtlas

SC / Spartanburg

SC · EV charging

EV charging in Spartanburg, SC

Here is what NREL's public data shows about EV charging in Spartanburg, SC. As of NREL AFDC data retrieved July 2026, Spartanburg has 17 public charging stations with 29 Level 2 ports, including 15 DC fast-charging ports for quick top-ups.

DC fast   Level 2   not recently confirmed  ·  click a marker for details, directions & Street View

⚡ 6 stations list free charging

Stations are operated across 8 networks: Non-networked (7), ChargePoint Network (4), Tesla Destination (1), Tesla (1), and 4 more.

Connectors on record: J1772 (Level 2) at 12 stations; CCS (J1772 Combo) at 4 stations; NACS / Tesla at 2 stations.

Of these stations, 6 list free charging and 1 are paid, per NREL's pricing field. Pricing is not recorded for the remaining 10. Always confirm current pricing with the network before you charge.

2 stations carry a NACS / Tesla connector — relevant if you drive a Tesla or a newer EV that has switched to NACS.

Notable charging stations

The largest sites by port count, DC fast first. Spartanburg has 17 public stations in all — see the map above.

StationNetworkChargingConfirmed
Spartanburg, SC - Tesla Supercharger
2100 Winchester Pl
Tesla DC fast 8 DC fast · NACS / Tesla June 2026
CircleK - Spartanburg
8697 Asheville Hwy
CIRCLE_K DC fast 4 DC fast · CCS (J1772 Combo) May 2025
OPTIMUS CPO BTC SPARTANBRG1
675 Gossett Road
ChargePoint Network DC fast 1 DC fast · CCS (J1772 Combo) July 2026
OPTIMUS CPO BTC SPARTANBRG2
675 Gossett Road
ChargePoint Network DC fast 1 DC fast · CCS (J1772 Combo) July 2026
OPTIMUS CPO BTC WOFFRDCLLG1
151 Memorial Drive
ChargePoint Network DC fast 1 DC fast · CCS (J1772 Combo) July 2026
The Fitzgerald Apartments
327 E Kennedy St
Non-networked 4 Level 2 · J1772 (Level 2) ⚠ May 2024
490 W Blackstock Rd
490 W Blackstock Rd
LOOP 4 Level 2 · J1772 (Level 2) July 2026
AC Marriott Spartanburg - Tesla Destination
225 Main St
Tesla Destination 3 Level 2 · J1772 (Level 2), NACS / Tesla ⚠ July 2024
City of Spartanburg - Municipal Parking Garage
100 Dunbar St
Non-networked 2 Level 2 · J1772 (Level 2) October 2025
City of Spartanburg - Municipal Parking Garage
130 E Saint John St
Non-networked 2 Level 2 · J1772 (Level 2) October 2025

⚠ 2 of Spartanburg's 17 stations haven't been re-confirmed by NREL in over 18 months and may be out of service — confirm in the network's app. Spotted something out of date or missing? Report a correction.

What this means

Level 2 is the standard public and home charger (240V) — a few hours for a full charge, fine for shopping, work, or overnight. DC fast charging is the highway kind: 20–40 minutes to most of a charge, but not every station has it.

Connectors are the plug shape. J1772 is the universal Level 2 plug almost every non-Tesla EV uses. CCS and CHAdeMO are DC fast-charging plugs (CHAdeMO is older, mostly older Nissan Leafs). NACS is Tesla's plug, now the emerging US standard — many newer non-Teslas use it or an adapter.

This page summarizes NREL's own station records and is not a live availability map — a charger listed here can still be busy, broken, or behind a gate. Check the network's app before you rely on a specific plug.

Charging at home in Spartanburg?

Most EV owners do the bulk of their charging overnight at home on a Level 2 charger. See our home EV charger buying guide for what to look for and how to match a charger to your car's connector.

EV charging near Spartanburg

Source: U.S. DOE / NREL Alternative Fuels Data Center (AFDC) Station Locator, retrieved July 2026. Public stations only.