SC / Summerville
SC · EV charging
EV charging in Summerville, SC
Here is what NREL's public data shows about EV charging in Summerville, SC. As of NREL AFDC data retrieved July 2026, Summerville has 22 public charging stations with 56 Level 2 ports, including 5 DC fast-charging ports for quick top-ups.
DC fast Level 2 not recently confirmed · click a marker for details, directions & Street View
- 22Public stations
- 56Level 2 ports
- 5DC fast ports
- 8%Ports that are DC fast
⚡ 5 stations list free charging
Stations are operated across 5 networks: Blink Network (10), ChargePoint Network (6), Non-networked (4), AMPUP (1), and 1 more.
Connectors on record: J1772 (Level 2) at 20 stations; CCS (J1772 Combo) at 2 stations; CHAdeMO at 1 station.
Of these stations, 5 list free charging and 5 are paid, per NREL's pricing field. Pricing is not recorded for the remaining 12. Always confirm current pricing with the network before you charge.
Notable charging stations
The largest sites by port count, DC fast first. Summerville has 22 public stations in all — see the map above.
| Station | Network | Charging | Confirmed |
|---|---|---|---|
| Flying J 1068 799 Jedburg Road | eVgo Network | DC fast 4 DC fast · CCS (J1772 Combo) | July 2026 |
| McElveen Buick GMC 121 Farmington Rd | AMPUP | DC fast 1 DC fast · CHAdeMO, CCS (J1772 Combo) | ⚠ August 2023 |
| Summerville Medical Center 295 Midland Parkway | Blink Network | 15 Level 2 · J1772 (Level 2) | July 2026 |
| Roper St Francis Berkeley Hospital 100 Callen Blvd | Non-networked | 8 Level 2 · J1772 (Level 2) | June 2025 |
| South City Summerville Apartments 50 Cheryl Lane | Blink Network | 6 Level 2 · J1772 (Level 2) | July 2026 |
| Building 100 100 Bushwood Court | Blink Network | 2 Level 2 · J1772 (Level 2) | July 2026 |
| Building 200 200 Bushwood Court | Blink Network | 2 Level 2 · J1772 (Level 2) | July 2026 |
| Building 500 500 Raleigh Circle | Blink Network | 2 Level 2 · J1772 (Level 2) | July 2026 |
| Building 300 300 Gozer Place | Blink Network | 2 Level 2 · J1772 (Level 2) | July 2026 |
| Building 400 400 Gozer Place | Blink Network | 2 Level 2 · J1772 (Level 2) | July 2026 |
⚠ 1 of Summerville's 22 stations haven't been re-confirmed by NREL in over 18 months and may be out of service — confirm in the network's app. Spotted something out of date or missing? Report a correction.
What this means
Level 2 is the standard public and home charger (240V) — a few hours for a full charge, fine for shopping, work, or overnight. DC fast charging is the highway kind: 20–40 minutes to most of a charge, but not every station has it.
Connectors are the plug shape. J1772 is the universal Level 2 plug almost every non-Tesla EV uses. CCS and CHAdeMO are DC fast-charging plugs (CHAdeMO is older, mostly older Nissan Leafs). NACS is Tesla's plug, now the emerging US standard — many newer non-Teslas use it or an adapter.
This page summarizes NREL's own station records and is not a live availability map — a charger listed here can still be busy, broken, or behind a gate. Check the network's app before you rely on a specific plug.
Charging at home in Summerville?
Most EV owners do the bulk of their charging overnight at home on a Level 2 charger. See our home EV charger buying guide for what to look for and how to match a charger to your car's connector.
EV charging near Summerville
Source: U.S. DOE / NREL Alternative Fuels Data Center (AFDC) Station Locator, retrieved July 2026. Public stations only.