ChargingAtlas

TN / Murfreesboro

TN · EV charging

EV charging in Murfreesboro, TN

Here is what NREL's public data shows about EV charging in Murfreesboro, TN. As of NREL AFDC data retrieved July 2026, Murfreesboro has 28 public charging stations with 65 Level 2 ports, including 21 DC fast-charging ports for quick top-ups.

DC fast   Level 2   not recently confirmed  ·  click a marker for details, directions & Street View

⚡ 7 stations list free charging

Stations are operated across 8 networks: ChargePoint Network (12), Blink Network (9), Tesla Destination (2), Non-networked (1), and 4 more.

Connectors on record: J1772 (Level 2) at 24 stations; NACS / Tesla at 4 stations; CCS (J1772 Combo) at 2 stations; CHAdeMO at 1 station.

Of these stations, 7 list free charging and 1 are paid, per NREL's pricing field. Pricing is not recorded for the remaining 20. Always confirm current pricing with the network before you charge.

4 stations carry a NACS / Tesla connector — relevant if you drive a Tesla or a newer EV that has switched to NACS.

Notable charging stations

The largest sites by port count, DC fast first. Murfreesboro has 28 public stations in all — see the map above.

StationNetworkChargingConfirmed
Murfreesboro, TN - Tesla Supercharger
1851 Old Fort Pkwy
Tesla DC fast 12 DC fast · NACS / Tesla June 2026
Electric Era Charging Station
555 New Salem Highway
ELECTRIC_ERA DC fast 8 DC fast · CCS (J1772 Combo), NACS / Tesla July 2026
MBORO HYU HYD L3 A FRONT
1625 South Church Street
ChargePoint Network DC fast 1 DC fast · CHAdeMO, CCS (J1772 Combo) July 2026
Hilton Garden Inn Murfreesboro - Tesla Destination
1335 Conference Center Boulevard
Tesla Destination 12 Level 2 · J1772 (Level 2), NACS / Tesla ⚠ July 2024
Century Autumn Wood
630 Saint Andrews Dr
LOOP 6 Level 2 · J1772 (Level 2) July 2026
City Hall Parking Garage
111 W Vine St
Blink Network 4 Level 2 · J1772 (Level 2) July 2026
Sports-Com
2310 Memorial Blvd
Blink Network 4 Level 2 · J1772 (Level 2) July 2026
Saint Thomas Rutherford Parking Garage
1880 Medical Center Pkwy
ABM 4 Level 2 · J1772 (Level 2) July 2026
Panther Creek LLC
3625 Manson Pike
Blink Network 4 Level 2 · J1772 (Level 2) July 2026
Holiday Inn Express & Suites
2230 Medical Center Parkway
Blink Network 4 Level 2 · J1772 (Level 2) July 2026

⚠ 2 of Murfreesboro's 28 stations haven't been re-confirmed by NREL in over 18 months and may be out of service — confirm in the network's app. Spotted something out of date or missing? Report a correction.

What this means

Level 2 is the standard public and home charger (240V) — a few hours for a full charge, fine for shopping, work, or overnight. DC fast charging is the highway kind: 20–40 minutes to most of a charge, but not every station has it.

Connectors are the plug shape. J1772 is the universal Level 2 plug almost every non-Tesla EV uses. CCS and CHAdeMO are DC fast-charging plugs (CHAdeMO is older, mostly older Nissan Leafs). NACS is Tesla's plug, now the emerging US standard — many newer non-Teslas use it or an adapter.

This page summarizes NREL's own station records and is not a live availability map — a charger listed here can still be busy, broken, or behind a gate. Check the network's app before you rely on a specific plug.

Charging at home in Murfreesboro?

Most EV owners do the bulk of their charging overnight at home on a Level 2 charger. See our home EV charger buying guide for what to look for and how to match a charger to your car's connector.

EV charging near Murfreesboro

Source: U.S. DOE / NREL Alternative Fuels Data Center (AFDC) Station Locator, retrieved July 2026. Public stations only.