TX / Kerrville
TX · EV charging
EV charging in Kerrville, TX
Here is what NREL's public data shows about EV charging in Kerrville, TX. As of NREL AFDC data retrieved July 2026, Kerrville has 12 public charging stations with 18 Level 2 ports, including 6 DC fast-charging ports for quick top-ups.
DC fast Level 2 not recently confirmed · click a marker for details, directions & Street View
- 12Public stations
- 18Level 2 ports
- 6DC fast ports
- 25%Ports that are DC fast
Stations are operated across 2 networks: ChargePoint Network (11), FORD_CHARGE (1).
Connectors on record: J1772 (Level 2) at 9 stations; CCS (J1772 Combo) at 3 stations; CHAdeMO at 2 stations.
Notable charging stations
The largest sites by port count, DC fast first. Kerrville has 12 public stations in all — see the map above.
| Station | Network | Charging | Confirmed |
|---|---|---|---|
| Ken Stoepel Ford 400 Sidney Baker St S | FORD_CHARGE | DC fast 4 DC fast · CCS (J1772 Combo) | July 2026 |
| KERRVILLE PUB VISITOR CENTER 2108 Sidney Baker St | ChargePoint Network | DC fast 1 DC fast · CHAdeMO, CCS (J1772 Combo) | July 2026 |
| KV MAIN CAMPUS KV RETAIL DC 2 145 Avery Rd | ChargePoint Network | DC fast 1 DC fast · CHAdeMO, CCS (J1772 Combo) | July 2026 |
| KERRVILLE PUB KERRVILLE GAR 201 Clay St | ChargePoint Network | 2 Level 2 · J1772 (Level 2) | July 2026 |
| KV MAIN CAMPUS KV RETAIL L2 1575 N | ChargePoint Network | 2 Level 2 · J1772 (Level 2) | July 2026 |
| KERRVILLE PUB ARTS MUSEUM 1 1550 Bandera Hwy | ChargePoint Network | 2 Level 2 · J1772 (Level 2) | July 2026 |
| KERRVILLE PUB NATURE CNTR1 150 Francisco Lemos St | ChargePoint Network | 2 Level 2 · J1772 (Level 2) | July 2026 |
| KERRVILLE PUB PETERSON HOSPIT 551 Hill Country Dr | ChargePoint Network | 2 Level 2 · J1772 (Level 2) | July 2026 |
| KERRVILLE PUB SCHREINER UNIV 2100 Memorial Blvd | ChargePoint Network | 2 Level 2 · J1772 (Level 2) | July 2026 |
| GREENHILLS STATION #1 1016 Junction Hwy | ChargePoint Network | 2 Level 2 · J1772 (Level 2) | July 2026 |
Spotted something out of date or missing? Report a correction.
What this means
Level 2 is the standard public and home charger (240V) — a few hours for a full charge, fine for shopping, work, or overnight. DC fast charging is the highway kind: 20–40 minutes to most of a charge, but not every station has it.
Connectors are the plug shape. J1772 is the universal Level 2 plug almost every non-Tesla EV uses. CCS and CHAdeMO are DC fast-charging plugs (CHAdeMO is older, mostly older Nissan Leafs). NACS is Tesla's plug, now the emerging US standard — many newer non-Teslas use it or an adapter.
This page summarizes NREL's own station records and is not a live availability map — a charger listed here can still be busy, broken, or behind a gate. Check the network's app before you rely on a specific plug.
Charging at home in Kerrville?
Most EV owners do the bulk of their charging overnight at home on a Level 2 charger. See our home EV charger buying guide for what to look for and how to match a charger to your car's connector.
EV charging near Kerrville
Source: U.S. DOE / NREL Alternative Fuels Data Center (AFDC) Station Locator, retrieved July 2026. Public stations only.