UT / Layton
UT · EV charging
EV charging in Layton, UT
Here is what NREL's public data shows about EV charging in Layton, UT. As of NREL AFDC data retrieved July 2026, Layton has 12 public charging stations with 20 Level 2 ports, including 8 DC fast-charging ports for quick top-ups.
DC fast Level 2 not recently confirmed · click a marker for details, directions & Street View
- 12Public stations
- 20Level 2 ports
- 8DC fast ports
- 29%Ports that are DC fast
Stations are operated across 4 networks: ChargePoint Network (9), Electrify America (1), FORD_CHARGE (1), Blink Network (1).
Connectors on record: J1772 (Level 2) at 10 stations; CCS (J1772 Combo) at 2 stations.
Notable charging stations
The largest sites by port count, DC fast first. Layton has 12 public stations in all — see the map above.
| Station | Network | Charging | Confirmed |
|---|---|---|---|
| RMP Davis (Layton, UT) 1651 N 700 W | Electrify America | DC fast 6 DC fast · CCS (J1772 Combo) | July 2026 |
| Ed Kenley Ford 1888 N Main St | FORD_CHARGE | DC fast 2 DC fast · CCS (J1772 Combo) | July 2026 |
| SCO LAYTON HOSP_2 201 Layton Pkwy | ChargePoint Network | 2 Level 2 · J1772 (Level 2) | July 2026 |
| RC WILLEY LAYTON 1 2195 University Park Blvd | ChargePoint Network | 2 Level 2 · J1772 (Level 2) | July 2026 |
| SCO LAYTON HOSP_1 201 Layton Pkwy | ChargePoint Network | 2 Level 2 · J1772 (Level 2) | July 2026 |
| RC WILLEY LAYTON 2 2195 University Park Blvd | ChargePoint Network | 2 Level 2 · J1772 (Level 2) | July 2026 |
| UT MARKET DAVISHOSPITAL#1 2250 N 1700 W | ChargePoint Network | 2 Level 2 · J1772 (Level 2) | July 2026 |
| UT MARKET DAVISHOSPITAL#3 1600W Antelope Dr | ChargePoint Network | 2 Level 2 · J1772 (Level 2) | July 2026 |
| UT MARKET DAVISHOSPITAL#2 2250 N 1700 W | ChargePoint Network | 2 Level 2 · J1772 (Level 2) | July 2026 |
| SCO LAYTON CLINIC-2 2075 N 1200 W | ChargePoint Network | 2 Level 2 · J1772 (Level 2) | July 2026 |
Spotted something out of date or missing? Report a correction.
What this means
Level 2 is the standard public and home charger (240V) — a few hours for a full charge, fine for shopping, work, or overnight. DC fast charging is the highway kind: 20–40 minutes to most of a charge, but not every station has it.
Connectors are the plug shape. J1772 is the universal Level 2 plug almost every non-Tesla EV uses. CCS and CHAdeMO are DC fast-charging plugs (CHAdeMO is older, mostly older Nissan Leafs). NACS is Tesla's plug, now the emerging US standard — many newer non-Teslas use it or an adapter.
This page summarizes NREL's own station records and is not a live availability map — a charger listed here can still be busy, broken, or behind a gate. Check the network's app before you rely on a specific plug.
Charging at home in Layton?
Most EV owners do the bulk of their charging overnight at home on a Level 2 charger. See our home EV charger buying guide for what to look for and how to match a charger to your car's connector.
EV charging near Layton
Source: U.S. DOE / NREL Alternative Fuels Data Center (AFDC) Station Locator, retrieved July 2026. Public stations only.