ChargingAtlas

VA / Ashburn

VA · EV charging

EV charging in Ashburn, VA

Here is what NREL's public data shows about EV charging in Ashburn, VA. As of NREL AFDC data retrieved July 2026, Ashburn has 53 public charging stations with 107 Level 2 ports, including 72 DC fast-charging ports for quick top-ups.

DC fast   Level 2   not recently confirmed  ·  click a marker for details, directions & Street View

Stations are operated across 6 networks: ChargePoint Network (47), Tesla (2), eVgo Network (1), Electrify America (1), and 2 more.

Connectors on record: J1772 (Level 2) at 50 stations; NACS / Tesla at 4 stations; CCS (J1772 Combo) at 3 stations; CHAdeMO at 2 stations.

4 stations carry a NACS / Tesla connector — relevant if you drive a Tesla or a newer EV that has switched to NACS.

Notable charging stations

The largest sites by port count, DC fast first. Ashburn has 53 public stations in all — see the map above.

StationNetworkChargingConfirmed
Center of Excellence Ashburn (For Testing Purpose Only)
21660 Red Rum drive
Electrify America DC fast 40 DC fast + 1 Level 2 · CHAdeMO, J1772 (Level 2), CCS (J1772 Combo), NACS / Tesla July 2026
Ashburn, VA - Van Metre Drive - Tesla Supercharger
43101 Van Metre Dr
Tesla DC fast 12 DC fast · NACS / Tesla June 2026
One Loudoun MB.HPC
20626 Easthampton Plaza
MERCEDES_BENZ DC fast 10 DC fast · CCS (J1772 Combo), NACS / Tesla July 2026
Ashburn, VA - Tesla Supercharger
43300 Southern Walk Plaza
Tesla DC fast 8 DC fast · NACS / Tesla June 2026
Ashburn Village Shopping Center
44110 Ashburn Shopping Plz
eVgo Network DC fast 2 DC fast + 1 Level 2 · CHAdeMO, J1772 (Level 2), CCS (J1772 Combo) July 2026
Aventon Moorefield
43601 Charitable Street
Blink Network 12 Level 2 · J1772 (Level 2) July 2026
LOUDOUN METRO STATION 12
43625 Croson lane
ChargePoint Network 2 Level 2 · J1772 (Level 2) July 2026
LOUDOUN METRO STATION 1
43624 Croson Lane
ChargePoint Network 2 Level 2 · J1772 (Level 2) July 2026
LOUDOUN METRO STATION 13
43625 Croson lame
ChargePoint Network 2 Level 2 · J1772 (Level 2) July 2026
LOUDOUN METRO STATION 5
43625 Croson Lane
ChargePoint Network 2 Level 2 · J1772 (Level 2) July 2026

Spotted something out of date or missing? Report a correction.

What this means

Level 2 is the standard public and home charger (240V) — a few hours for a full charge, fine for shopping, work, or overnight. DC fast charging is the highway kind: 20–40 minutes to most of a charge, but not every station has it.

Connectors are the plug shape. J1772 is the universal Level 2 plug almost every non-Tesla EV uses. CCS and CHAdeMO are DC fast-charging plugs (CHAdeMO is older, mostly older Nissan Leafs). NACS is Tesla's plug, now the emerging US standard — many newer non-Teslas use it or an adapter.

This page summarizes NREL's own station records and is not a live availability map — a charger listed here can still be busy, broken, or behind a gate. Check the network's app before you rely on a specific plug.

Charging at home in Ashburn?

Most EV owners do the bulk of their charging overnight at home on a Level 2 charger. See our home EV charger buying guide for what to look for and how to match a charger to your car's connector.

EV charging near Ashburn

Source: U.S. DOE / NREL Alternative Fuels Data Center (AFDC) Station Locator, retrieved July 2026. Public stations only.