VT / Stowe
VT · EV charging
EV charging in Stowe, VT
Here is what NREL's public data shows about EV charging in Stowe, VT. As of NREL AFDC data retrieved July 2026, Stowe has 20 public charging stations with 39 Level 2 ports, including 1 DC fast-charging port for quick top-ups.
DC fast Level 2 not recently confirmed · click a marker for details, directions & Street View
- 20Public stations
- 39Level 2 ports
- 1DC fast ports
- 3%Ports that are DC fast
⚡ 1 station lists free charging
Stations are operated across 5 networks: ChargePoint Network (12), Tesla Destination (4), AMPUP (2), Non-networked (1), and 1 more.
Connectors on record: J1772 (Level 2) at 17 stations; NACS / Tesla at 4 stations; CHAdeMO at 1 station; CCS (J1772 Combo) at 1 station.
Of these stations, 1 list free charging, per NREL's pricing field. Pricing is not recorded for the remaining 19. Always confirm current pricing with the network before you charge.
4 stations carry a NACS / Tesla connector — relevant if you drive a Tesla or a newer EV that has switched to NACS.
Notable charging stations
The largest sites by port count, DC fast first. Stowe has 20 public stations in all — see the map above.
| Station | Network | Charging | Confirmed |
|---|---|---|---|
| STOWE ELECTRIC THOMPSON PARK 2699 Mountain Rd | ChargePoint Network | DC fast 1 DC fast · CHAdeMO, CCS (J1772 Combo) | July 2026 |
| Topnotch Resort & Spa - Tesla Destination 4000 Mountain Rd | Tesla Destination | 5 Level 2 · J1772 (Level 2), NACS / Tesla | ⚠ July 2024 |
| Stowe Mountain Lodge 2 - Tesla Destination 7412 Mountain Rd | Tesla Destination | 4 Level 2 · NACS / Tesla | ⚠ July 2024 |
| Topnotch Resort - Tesla Destination 4000 Mountain Resort | Tesla Destination | 3 Level 2 · NACS / Tesla | ⚠ July 2024 |
| STOWE ELECTRIC GREEN MT INN 2 Park Pl | ChargePoint Network | 2 Level 2 · J1772 (Level 2) | July 2026 |
| STOWE ELECTRIC TRAPP BREWERY 1333 Luce Hill Rd | ChargePoint Network | 2 Level 2 · J1772 (Level 2) | July 2026 |
| STOWE ELECTRIC REC PATH 137 Main Street Stowe Rec Path | ChargePoint Network | 2 Level 2 · J1772 (Level 2) | July 2026 |
| STOWE ELECTRIC STOWEFLAKE 1208 Cape Cod Rd | ChargePoint Network | 2 Level 2 · J1772 (Level 2) | July 2026 |
| STOWE ELECTRIC AMER. FLATBREAD 1190 Mountain Rd American Flatbread | ChargePoint Network | 2 Level 2 · J1772 (Level 2) | July 2026 |
| Stowe Mountain Lodge - Tesla Destination 7412 Mountain Rd | Tesla Destination | 2 Level 2 · J1772 (Level 2), NACS / Tesla | ⚠ July 2024 |
⚠ 6 of Stowe's 20 stations haven't been re-confirmed by NREL in over 18 months and may be out of service — confirm in the network's app. Spotted something out of date or missing? Report a correction.
What this means
Level 2 is the standard public and home charger (240V) — a few hours for a full charge, fine for shopping, work, or overnight. DC fast charging is the highway kind: 20–40 minutes to most of a charge, but not every station has it.
Connectors are the plug shape. J1772 is the universal Level 2 plug almost every non-Tesla EV uses. CCS and CHAdeMO are DC fast-charging plugs (CHAdeMO is older, mostly older Nissan Leafs). NACS is Tesla's plug, now the emerging US standard — many newer non-Teslas use it or an adapter.
This page summarizes NREL's own station records and is not a live availability map — a charger listed here can still be busy, broken, or behind a gate. Check the network's app before you rely on a specific plug.
Charging at home in Stowe?
Most EV owners do the bulk of their charging overnight at home on a Level 2 charger. See our home EV charger buying guide for what to look for and how to match a charger to your car's connector.
EV charging near Stowe
Source: U.S. DOE / NREL Alternative Fuels Data Center (AFDC) Station Locator, retrieved July 2026. Public stations only.