WI / Black River Falls
WI · EV charging
EV charging in Black River Falls, WI
Here is what NREL's public data shows about EV charging in Black River Falls, WI. As of NREL AFDC data retrieved July 2026, Black River Falls has 6 public charging stations with 8 Level 2 ports, including 18 DC fast-charging ports for quick top-ups.
DC fast Level 2 not recently confirmed · click a marker for details, directions & Street View
- 6Public stations
- 8Level 2 ports
- 18DC fast ports
- 69%Ports that are DC fast
⚡ 1 station lists free charging
Stations are operated across 5 networks: ZEFNET (2), ChargePoint Network (1), Tesla (1), eVgo Network (1), and 1 more.
Connectors on record: J1772 (Level 2) at 4 stations; CCS (J1772 Combo) at 2 stations; NACS / Tesla at 1 station; CHAdeMO at 1 station.
Of these stations, 1 list free charging, per NREL's pricing field. Pricing is not recorded for the remaining 5. Always confirm current pricing with the network before you charge.
1 station carries a NACS / Tesla connector — relevant if you drive a Tesla or a newer EV that has switched to NACS.
Notable charging stations
The largest sites by port count, DC fast first. Black River Falls has 6 public stations in all — see the map above.
| Station | Network | Charging | Confirmed |
|---|---|---|---|
| Black River Falls, WI - Commerce Dr - Tesla Supercharger 925 Commerce Dr | Tesla | DC fast 12 DC fast · NACS / Tesla | June 2026 |
| Flying J 756 780 State Hwy 54 | eVgo Network | DC fast 4 DC fast · CCS (J1772 Combo) | July 2026 |
| Black River Falls Oasis 701 Oasis Road | ZEFNET | DC fast 2 DC fast + 2 Level 2 · CHAdeMO, J1772 (Level 2), CCS (J1772 Combo) | July 2026 |
| GROSS BRF EV 1 1009 Commerce Dr | ChargePoint Network | 2 Level 2 · J1772 (Level 2) | July 2026 |
| Wazee Lake null N6302 North Brockway Road | ZEFNET | 2 Level 2 · J1772 (Level 2) | July 2026 |
| Ho-Chunk Hotel & Gaming W9010 WI-54 | Non-networked | 2 Level 2 · J1772 (Level 2) | May 2025 |
Spotted something out of date or missing? Report a correction.
What this means
Level 2 is the standard public and home charger (240V) — a few hours for a full charge, fine for shopping, work, or overnight. DC fast charging is the highway kind: 20–40 minutes to most of a charge, but not every station has it.
Connectors are the plug shape. J1772 is the universal Level 2 plug almost every non-Tesla EV uses. CCS and CHAdeMO are DC fast-charging plugs (CHAdeMO is older, mostly older Nissan Leafs). NACS is Tesla's plug, now the emerging US standard — many newer non-Teslas use it or an adapter.
This page summarizes NREL's own station records and is not a live availability map — a charger listed here can still be busy, broken, or behind a gate. Check the network's app before you rely on a specific plug.
Charging at home in Black River Falls?
Most EV owners do the bulk of their charging overnight at home on a Level 2 charger. See our home EV charger buying guide for what to look for and how to match a charger to your car's connector.
EV charging near Black River Falls
Source: U.S. DOE / NREL Alternative Fuels Data Center (AFDC) Station Locator, retrieved July 2026. Public stations only.