WI / Oak Creek
WI · EV charging
EV charging in Oak Creek, WI
Here is what NREL's public data shows about EV charging in Oak Creek, WI. As of NREL AFDC data retrieved July 2026, Oak Creek has 22 public charging stations with 34 Level 2 ports, including 16 DC fast-charging ports for quick top-ups.
DC fast Level 2 not recently confirmed · click a marker for details, directions & Street View
- 22Public stations
- 34Level 2 ports
- 16DC fast ports
- 32%Ports that are DC fast
⚡ 1 station lists free charging
Stations are operated across 6 networks: ChargePoint Network (14), Blink Network (3), TURNONGREEN (2), Tesla (1), and 2 more.
Connectors on record: J1772 (Level 2) at 20 stations; NACS / Tesla at 1 station; CCS (J1772 Combo) at 1 station.
Of these stations, 1 list free charging, per NREL's pricing field. Pricing is not recorded for the remaining 21. Always confirm current pricing with the network before you charge.
1 station carries a NACS / Tesla connector — relevant if you drive a Tesla or a newer EV that has switched to NACS.
Notable charging stations
The largest sites by port count, DC fast first. Oak Creek has 22 public stations in all — see the map above.
| Station | Network | Charging | Confirmed |
|---|---|---|---|
| Oak Creek, WI - Tesla Supercharger 171 West Town Square Way | Tesla | DC fast 10 DC fast · NACS / Tesla | June 2026 |
| Meijer 283 (Oak Creek, WI) 171 W Town Square Way | Electrify America | DC fast 6 DC fast · CCS (J1772 Combo) | July 2026 |
| The Broadacre 441 West Ryan Road | Blink Network | 6 Level 2 · J1772 (Level 2) | July 2026 |
| Oak Creek Campus 6665 South Howell Avenue | Blink Network | 4 Level 2 · J1772 (Level 2) | July 2026 |
| BACK 1 HOMEWOOD #2 IKEA Way | ChargePoint Network | 2 Level 2 · J1772 (Level 2) | July 2026 |
| BACK 1 HOMEWOOD #1 IKEA Way | ChargePoint Network | 2 Level 2 · J1772 (Level 2) | July 2026 |
| MKEOK - TownePlace Suites Oak Creek 7980 South Market Street | EV Connect | 2 Level 2 · J1772 (Level 2) | July 2026 |
| Broadacre Building C 441 West Ryan Road | Blink Network | 2 Level 2 · J1772 (Level 2) | July 2026 |
| Avid Hotel Oak Creek 9315 S 13th St | TURNONGREEN | 2 Level 2 · J1772 (Level 2) | May 2025 |
| Avid Hotel Oak Creek 9293 South 13th St | TURNONGREEN | 2 Level 2 · J1772 (Level 2) | March 2026 |
Spotted something out of date or missing? Report a correction.
What this means
Level 2 is the standard public and home charger (240V) — a few hours for a full charge, fine for shopping, work, or overnight. DC fast charging is the highway kind: 20–40 minutes to most of a charge, but not every station has it.
Connectors are the plug shape. J1772 is the universal Level 2 plug almost every non-Tesla EV uses. CCS and CHAdeMO are DC fast-charging plugs (CHAdeMO is older, mostly older Nissan Leafs). NACS is Tesla's plug, now the emerging US standard — many newer non-Teslas use it or an adapter.
This page summarizes NREL's own station records and is not a live availability map — a charger listed here can still be busy, broken, or behind a gate. Check the network's app before you rely on a specific plug.
Charging at home in Oak Creek?
Most EV owners do the bulk of their charging overnight at home on a Level 2 charger. See our home EV charger buying guide for what to look for and how to match a charger to your car's connector.
EV charging near Oak Creek
Source: U.S. DOE / NREL Alternative Fuels Data Center (AFDC) Station Locator, retrieved July 2026. Public stations only.