WY / Cheyenne
WY · EV charging
EV charging in Cheyenne, WY
Here is what NREL's public data shows about EV charging in Cheyenne, WY. As of NREL AFDC data retrieved July 2026, Cheyenne has 18 public charging stations with 22 Level 2 ports, including 24 DC fast-charging ports for quick top-ups.
DC fast Level 2 not recently confirmed · click a marker for details, directions & Street View
- 18Public stations
- 22Level 2 ports
- 24DC fast ports
- 52%Ports that are DC fast
⚡ 1 station lists free charging
Stations are operated across 8 networks: ChargePoint Network (11), Tesla (1), Electrify America (1), EV Connect (1), and 4 more.
Connectors on record: J1772 (Level 2) at 10 stations; CCS (J1772 Combo) at 7 stations; NACS / Tesla at 1 station.
Of these stations, 1 list free charging, per NREL's pricing field. Pricing is not recorded for the remaining 17. Always confirm current pricing with the network before you charge.
1 station carries a NACS / Tesla connector — relevant if you drive a Tesla or a newer EV that has switched to NACS.
Notable charging stations
The largest sites by port count, DC fast first. Cheyenne has 18 public stations in all — see the map above.
| Station | Network | Charging | Confirmed |
|---|---|---|---|
| Cheyenne, WY 1400 Dell Range Blvd. | RIVIAN_ADVENTURE | DC fast 6 DC fast · CCS (J1772 Combo) | July 2026 |
| Cheyenne, WY - Tesla Supercharger 1400 Dell Range Blvd. | Tesla | DC fast 4 DC fast · NACS / Tesla | June 2026 |
| Target T0224 (Cheyenne, WY) 1708 Dell Range Blvd | Electrify America | DC fast 4 DC fast · CCS (J1772 Combo) | July 2026 |
| Flying J 759 2250 Etchepare Drive | eVgo Network | DC fast 4 DC fast · CCS (J1772 Combo) | July 2026 |
| Tyrrell Chevrolet 2142 W Lincolnway | VIALYNK | DC fast 2 DC fast · CCS (J1772 Combo) | July 2026 |
| KG FORD CHEY POWER LINK 1 2200 Westland Road | ChargePoint Network | DC fast 2 DC fast · CCS (J1772 Combo) | July 2026 |
| HCHD_1 DCFAST HOG 3320 E Lincolnway | ChargePoint Network | DC fast 1 DC fast · CCS (J1772 Combo) | July 2026 |
| Halladay Motors Inc 2100 Westland RD | EV Connect | DC fast 1 DC fast · CCS (J1772 Combo) | July 2026 |
| Ken Garff Motors 2200 Westland Rd | Non-networked | 4 Level 2 · J1772 (Level 2) | January 2026 |
| KHC POINT 1 429 W Fox Farm Rd | ChargePoint Network | 2 Level 2 · J1772 (Level 2) | July 2026 |
Spotted something out of date or missing? Report a correction.
What this means
Level 2 is the standard public and home charger (240V) — a few hours for a full charge, fine for shopping, work, or overnight. DC fast charging is the highway kind: 20–40 minutes to most of a charge, but not every station has it.
Connectors are the plug shape. J1772 is the universal Level 2 plug almost every non-Tesla EV uses. CCS and CHAdeMO are DC fast-charging plugs (CHAdeMO is older, mostly older Nissan Leafs). NACS is Tesla's plug, now the emerging US standard — many newer non-Teslas use it or an adapter.
This page summarizes NREL's own station records and is not a live availability map — a charger listed here can still be busy, broken, or behind a gate. Check the network's app before you rely on a specific plug.
Charging at home in Cheyenne?
Most EV owners do the bulk of their charging overnight at home on a Level 2 charger. See our home EV charger buying guide for what to look for and how to match a charger to your car's connector.
EV charging near Cheyenne
Source: U.S. DOE / NREL Alternative Fuels Data Center (AFDC) Station Locator, retrieved July 2026. Public stations only.