ChargingAtlas

CA / Arcadia

CA · EV charging

EV charging in Arcadia, CA

Here is what NREL's public data shows about EV charging in Arcadia, CA. As of NREL AFDC data retrieved October 2026, Arcadia has 24 public charging stations with 36 Level 2 ports, including 15 DC fast-charging ports for quick top-ups.

DC fast   Level 2   not recently confirmed  ·  click a marker for details, directions & Street View

Stations are operated across 6 networks: ChargePoint Network (18), Electrify America (2), POWERFLEX (1), EV Connect (1), and 2 more.

Connectors on record: J1772 (Level 2) at 21 stations; NACS / Tesla at 3 stations; CCS (J1772 Combo) at 3 stations; CHAdeMO at 1 station.

Of these stations, 2 are paid, per NREL's pricing field. Pricing is not recorded for the remaining 22. Always confirm current pricing with the network before you charge.

3 stations carry a NACS / Tesla connector — relevant if you drive a Tesla or a newer EV that has switched to NACS.

How Arcadia compares

Who runs Arcadia's DC fast charging

Network DC fast ports Share
Electrify America 9 60%
Non-networked 4 27%
EVCS 2 13%

Last verified: NREL confirmed 92% of Arcadia's stations in the 12 months before this snapshot, most recently in October 2026.

Population: U.S. Census Bureau, Vintage 2024 population estimates (54,472 residents; California 39,431,263). Station counts use NREL's address city, which can extend past city limits, so rates are approximate.

Notable charging stations

The largest sites by port count, DC fast first. Arcadia has 24 public stations in all — see the map above.

StationNetworkChargingConfirmed
Westfield Santa Anita (Arcadia, CA)
400 South Baldwin Ave
Electrify America DC fast 6 DC fast · CCS (J1772 Combo) October 2026
Valero - Arcadia
102 E Duarte Rd
Non-networked DC fast 4 DC fast · CCS (J1772 Combo) ⚠ October 2022
Albertsons 0561 (Arcadia, CA)
298 E. Live Oak Avenue
Electrify America DC fast 3 DC fast + 1 Level 2 · J1772 (Level 2), NACS / Tesla October 2026
US Bank Arcadia - East Foothill
101 East Foothill Boulevard
EVCS DC fast 2 DC fast · CHAdeMO, CCS (J1772 Combo) October 2026
Arcadia Public Library
20 W. DUARTE ROAD
EV Connect 4 Level 2 · J1772 (Level 2) October 2026
LA County DPR Arboretum
301 N Baldwin Ave
POWERFLEX 3 Level 2 · J1772 (Level 2) May 2025
STATION 1 1
56 E Duarte Rd
ChargePoint Network 2 Level 2 · J1772 (Level 2) October 2026
PROMENADE MACYS SANTA ANITA 3
400 S Baldwin Ave
ChargePoint Network 2 Level 2 · J1772 (Level 2) October 2026
PROMENADE MACYS SANTA ANITA
400 S Baldwin Ave
ChargePoint Network 2 Level 2 · J1772 (Level 2) October 2026
57 WHEELER RETAIL 1
57 Wheeler Ave
ChargePoint Network 2 Level 2 · J1772 (Level 2) October 2026

⚠ 1 of Arcadia's 24 stations haven't been re-confirmed by NREL in over 18 months and may be out of service — confirm in the network's app. Spotted something out of date or missing? Report a correction.

What this means

Level 2 is the standard public and home charger (240V) — a few hours for a full charge, fine for shopping, work, or overnight. DC fast charging is the highway kind: 20–40 minutes to most of a charge, but not every station has it.

Connectors are the plug shape. J1772 is the universal Level 2 plug almost every non-Tesla EV uses. CCS and CHAdeMO are DC fast-charging plugs (CHAdeMO is older, mostly older Nissan Leafs). NACS is Tesla's plug, now the emerging US standard — many newer non-Teslas use it or an adapter.

This page summarizes NREL's own station records and is not a live availability map — a charger listed here can still be busy, broken, or behind a gate. Check the network's app before you rely on a specific plug.

Charging at home in Arcadia?

Most EV owners do the bulk of their charging overnight at home on a Level 2 charger. See our home EV charger buying guide for what to look for and how to match a charger to your car's connector.

EV charging near Arcadia

Source: U.S. DOE / NREL Alternative Fuels Data Center (AFDC) Station Locator, retrieved October 2026. Public stations only.