ChargingAtlas

CA / Compton

CA · EV charging

EV charging in Compton, CA

Here is what NREL's public data shows about EV charging in Compton, CA. As of NREL AFDC data retrieved October 2026, Compton has 14 public charging stations with 29 Level 2 ports, including 20 DC fast-charging ports for quick top-ups.

DC fast   Level 2   not recently confirmed  ·  click a marker for details, directions & Street View

Stations are operated across 5 networks: ChargePoint Network (10), eVgo Network (1), EVRANGE (1), LOOP (1), and 1 more.

Connectors on record: J1772 (Level 2) at 12 stations; CHAdeMO at 1 station; CCS (J1772 Combo) at 1 station; NACS / Tesla at 1 station.

Of these stations, 1 are paid, per NREL's pricing field. Pricing is not recorded for the remaining 13. Always confirm current pricing with the network before you charge.

1 station carries a NACS / Tesla connector — relevant if you drive a Tesla or a newer EV that has switched to NACS.

How Compton compares

Who runs Compton's DC fast charging

Network DC fast ports Share
Tesla 16 80%
eVgo Network 4 20%

Last verified: NREL confirmed 93% of Compton's stations in the 12 months before this snapshot, most recently in October 2026.

Population: U.S. Census Bureau, Vintage 2024 population estimates (91,129 residents; California 39,431,263). Station counts use NREL's address city, which can extend past city limits, so rates are approximate.

Notable charging stations

The largest sites by port count, DC fast first. Compton has 14 public stations in all — see the map above.

StationNetworkChargingConfirmed
Target - Tesla Supercharger
1621 S Alameda St E
Tesla DC fast 16 DC fast · NACS / Tesla ⚠ unknown
Soledad Center
909 S Central Ave
eVgo Network DC fast 4 DC fast · CHAdeMO, CCS (J1772 Combo) October 2026
LACSD Compton Field Office
920 S Alameda
EVRANGE 7 Level 2 · J1772 (Level 2) October 2026
Westland Santa Fe MHP
1680 S Tartar Ln
LOOP 4 Level 2 · J1772 (Level 2) July 2026
EDUCATION CTR 11 & 12
523 S Santa Fe Ave
ChargePoint Network 2 Level 2 · J1772 (Level 2) October 2026
EDUCATION CTR 9 & 10
523 S Santa Fe Ave
ChargePoint Network 2 Level 2 · J1772 (Level 2) October 2026
EDUCATION CTR 7 & 8
523 S Santa Fe Ave
ChargePoint Network 2 Level 2 · J1772 (Level 2) October 2026
EDUCATION CTR 3 & 4
523 S Santa Fe Ave
ChargePoint Network 2 Level 2 · J1772 (Level 2) October 2026
EDUCATION CTR 5 & 6
523 S Santa Fe Ave
ChargePoint Network 2 Level 2 · J1772 (Level 2) October 2026
EDUCATION CTR COMPTON HS S 2
417 W Alondra Blvd
ChargePoint Network 2 Level 2 · J1772 (Level 2) October 2026

⚠ 1 of Compton's 14 stations haven't been re-confirmed by NREL in over 18 months and may be out of service — confirm in the network's app. Spotted something out of date or missing? Report a correction.

What this means

Level 2 is the standard public and home charger (240V) — a few hours for a full charge, fine for shopping, work, or overnight. DC fast charging is the highway kind: 20–40 minutes to most of a charge, but not every station has it.

Connectors are the plug shape. J1772 is the universal Level 2 plug almost every non-Tesla EV uses. CCS and CHAdeMO are DC fast-charging plugs (CHAdeMO is older, mostly older Nissan Leafs). NACS is Tesla's plug, now the emerging US standard — many newer non-Teslas use it or an adapter.

This page summarizes NREL's own station records and is not a live availability map — a charger listed here can still be busy, broken, or behind a gate. Check the network's app before you rely on a specific plug.

Charging at home in Compton?

Most EV owners do the bulk of their charging overnight at home on a Level 2 charger. See our home EV charger buying guide for what to look for and how to match a charger to your car's connector.

EV charging near Compton

Source: U.S. DOE / NREL Alternative Fuels Data Center (AFDC) Station Locator, retrieved October 2026. Public stations only.