ChargingAtlas

CA / Garden Grove

CA · EV charging

EV charging in Garden Grove, CA

Here is what NREL's public data shows about EV charging in Garden Grove, CA. As of NREL AFDC data retrieved August 2026, Garden Grove has 9 public charging stations with 16 Level 2 ports, including 54 DC fast-charging ports for quick top-ups.

DC fast   Level 2   not recently confirmed  ·  click a marker for details, directions & Street View

Stations are operated across 5 networks: ChargePoint Network (4), Tesla (2), Electrify America (1), Tesla Destination (1), and 1 more.

Connectors on record: J1772 (Level 2) at 5 stations; NACS / Tesla at 3 stations; CCS (J1772 Combo) at 2 stations.

Of these stations, 1 are paid, per NREL's pricing field. Pricing is not recorded for the remaining 8. Always confirm current pricing with the network before you charge.

3 stations carry a NACS / Tesla connector — relevant if you drive a Tesla or a newer EV that has switched to NACS.

Notable charging stations

The largest sites by port count, DC fast first. Garden Grove has 9 public stations in all — see the map above.

StationNetworkChargingConfirmed
Garden Grove, CA - Tesla Supercharger
12891 Harbor Blvd
Tesla DC fast 32 DC fast · NACS / Tesla June 2026
Starbucks - Tesla Supercharger
12161 Valley View St
Tesla DC fast 16 DC fast · NACS / Tesla July 2026
Ralphs 71 (Garden Grove, CA)
12075 Euclid St
Electrify America DC fast 4 DC fast · CCS (J1772 Combo) August 2026
GM Oil Site 140 Chevron Garden Grove
8032 Garden Grove Blvd
RED_E DC fast 2 DC fast · CCS (J1772 Combo) August 2026
Anaheim, CA - Harbor Boulevard - Tesla Destination
11931 Harbor Blvd
Tesla Destination 8 Level 2 · J1772 (Level 2), NACS / Tesla ⚠ July 2024
SCGG STATION 1
12900 S Euclid St
ChargePoint Network 2 Level 2 · J1772 (Level 2) August 2026
CCC CCC GGB
12901 Euclid St
ChargePoint Network 2 Level 2 · J1772 (Level 2) August 2026
CCC CCC GG
12901 S Euclid St
ChargePoint Network 2 Level 2 · J1772 (Level 2) August 2026
CHAPMAN COMMONS CHAPMAN STA1
12668 Chapman Ave
ChargePoint Network 2 Level 2 · J1772 (Level 2) August 2026

⚠ 1 of Garden Grove's 9 stations haven't been re-confirmed by NREL in over 18 months and may be out of service — confirm in the network's app. Spotted something out of date or missing? Report a correction.

What this means

Level 2 is the standard public and home charger (240V) — a few hours for a full charge, fine for shopping, work, or overnight. DC fast charging is the highway kind: 20–40 minutes to most of a charge, but not every station has it.

Connectors are the plug shape. J1772 is the universal Level 2 plug almost every non-Tesla EV uses. CCS and CHAdeMO are DC fast-charging plugs (CHAdeMO is older, mostly older Nissan Leafs). NACS is Tesla's plug, now the emerging US standard — many newer non-Teslas use it or an adapter.

This page summarizes NREL's own station records and is not a live availability map — a charger listed here can still be busy, broken, or behind a gate. Check the network's app before you rely on a specific plug.

Charging at home in Garden Grove?

Most EV owners do the bulk of their charging overnight at home on a Level 2 charger. See our home EV charger buying guide for what to look for and how to match a charger to your car's connector.

EV charging near Garden Grove

Source: U.S. DOE / NREL Alternative Fuels Data Center (AFDC) Station Locator, retrieved August 2026. Public stations only.