CA / Moreno Valley
CA · EV charging
EV charging in Moreno Valley, CA
Here is what NREL's public data shows about EV charging in Moreno Valley, CA. As of NREL AFDC data retrieved September 2026, Moreno Valley has 70 public charging stations with 166 Level 2 ports, including 35 DC fast-charging ports for quick top-ups.
DC fast Level 2 not recently confirmed · click a marker for details, directions & Street View
- 70Public stations
- 166Level 2 ports
- 35DC fast ports
- 17%Ports that are DC fast
⚡ 1 station lists free charging
Stations are operated across 10 networks: ChargePoint Network (56), eVgo Network (3), EVGATEWAY (3), Blink Network (2), and 6 more.
Connectors on record: J1772 (Level 2) at 62 stations; CCS (J1772 Combo) at 6 stations; CHAdeMO at 4 stations; NACS / Tesla at 2 stations.
Of these stations, 1 list free charging and 2 are paid, per NREL's pricing field. Pricing is not recorded for the remaining 67. Always confirm current pricing with the network before you charge.
2 stations carry a NACS / Tesla connector — relevant if you drive a Tesla or a newer EV that has switched to NACS.
Notable charging stations
The largest sites by port count, DC fast first. Moreno Valley has 70 public stations in all — see the map above.
| Station | Network | Charging | Confirmed |
|---|---|---|---|
| Moreno Valley, CA - Tesla Supercharger 22330 Cactus Ave | Tesla | DC fast 12 DC fast · NACS / Tesla | June 2026 |
| WinCo Foods - Moreno Valley #46 12882 Day St | eVgo Network | DC fast 10 DC fast · CCS (J1772 Combo) | September 2026 |
| The District at Moreno Valley 12154 Davis St | eVgo Network | DC fast 6 DC fast · CCS (J1772 Combo) | September 2026 |
| Moreno Valley Mall 22500 Town Cir | eVgo Network | DC fast 4 DC fast · CHAdeMO, CCS (J1772 Combo) | September 2026 |
| WASTE WASTE RES. 1 14290 Frederick St | ChargePoint Network | DC fast 1 DC fast · CHAdeMO, CCS (J1772 Combo) | September 2026 |
| CITY HALL CORPORATE YARD5 25180 Santiago Dr | ChargePoint Network | DC fast 1 DC fast · CHAdeMO, CCS (J1772 Combo) | September 2026 |
| CITY HALL CORPORATE YARD7 25180 Santiago Drive | ChargePoint Network | DC fast 1 DC fast · CHAdeMO, CCS (J1772 Combo) | September 2026 |
| Hampton Inn Suites Moreno Valley Hotel 12611 Memorial Way | EVGATEWAY | 21 Level 2 · J1772 (Level 2) | September 2026 |
| Best Western Moreno Hotel 24840 Elder Ave | EVGATEWAY | 20 Level 2 · J1772 (Level 2) | September 2026 |
| Kaiser Permanente - Moreno Valley - CA530-2 27300 Iris Avenue | Blink Network | 6 Level 2 · J1772 (Level 2) | September 2026 |
Spotted something out of date or missing? Report a correction.
What this means
Level 2 is the standard public and home charger (240V) — a few hours for a full charge, fine for shopping, work, or overnight. DC fast charging is the highway kind: 20–40 minutes to most of a charge, but not every station has it.
Connectors are the plug shape. J1772 is the universal Level 2 plug almost every non-Tesla EV uses. CCS and CHAdeMO are DC fast-charging plugs (CHAdeMO is older, mostly older Nissan Leafs). NACS is Tesla's plug, now the emerging US standard — many newer non-Teslas use it or an adapter.
This page summarizes NREL's own station records and is not a live availability map — a charger listed here can still be busy, broken, or behind a gate. Check the network's app before you rely on a specific plug.
Charging at home in Moreno Valley?
Most EV owners do the bulk of their charging overnight at home on a Level 2 charger. See our home EV charger buying guide for what to look for and how to match a charger to your car's connector.
EV charging near Moreno Valley
Source: U.S. DOE / NREL Alternative Fuels Data Center (AFDC) Station Locator, retrieved September 2026. Public stations only.