ChargingAtlas

CA / Pacific Grove

CA · EV charging

EV charging in Pacific Grove, CA

Here is what NREL's public data shows about EV charging in Pacific Grove, CA. As of NREL AFDC data retrieved October 2026, Pacific Grove has 15 public charging stations with 20 Level 2 ports, including 18 DC fast-charging ports for quick top-ups.

DC fast   Level 2   not recently confirmed  ·  click a marker for details, directions & Street View

Stations are operated across 4 networks: ChargePoint Network (11), RIVIAN_WAYPOINTS (2), Electrify America (1), Tesla (1).

Connectors on record: J1772 (Level 2) at 11 stations; CCS (J1772 Combo) at 3 stations; CHAdeMO at 2 stations; NACS / Tesla at 1 station.

1 station carries a NACS / Tesla connector — relevant if you drive a Tesla or a newer EV that has switched to NACS.

How Pacific Grove compares

Who runs Pacific Grove's DC fast charging

Network DC fast ports Share
Tesla 12 67%
Electrify America 4 22%
ChargePoint Network 2 11%

Last verified: NREL confirmed 100% of Pacific Grove's stations in the 12 months before this snapshot, most recently in October 2026.

Population: U.S. Census Bureau, Vintage 2024 population estimates (14,851 residents; California 39,431,263). Station counts use NREL's address city, which can extend past city limits, so rates are approximate.

Notable charging stations

The largest sites by port count, DC fast first. Pacific Grove has 15 public stations in all — see the map above.

StationNetworkChargingConfirmed
Pacific Grove, CA - Tesla Supercharger
200 Country Club Gate Center
Tesla DC fast 12 DC fast · NACS / Tesla June 2026
Safeway 761 (Pacific Grove, CA)
1212 Forest Ave
Electrify America DC fast 4 DC fast · CCS (J1772 Combo) October 2026
PG CITYLOT2 ST1
223 16th St
ChargePoint Network DC fast 1 DC fast · CHAdeMO, CCS (J1772 Combo) October 2026
PG CITYLOT2 ST2
207 16th St
ChargePoint Network DC fast 1 DC fast · CHAdeMO, CCS (J1772 Combo) October 2026
MBA 160 SPACE 6 HC
160 Central Ave
ChargePoint Network 2 Level 2 · J1772 (Level 2) October 2026
MBA 160 SPACE 17 18
160 Central Ave
ChargePoint Network 2 Level 2 · J1772 (Level 2) October 2026
MBA 160 SPACE 15 16
160 Central Ave
ChargePoint Network 2 Level 2 · J1772 (Level 2) October 2026
MBA 160 SPACE 4 5
160 Central Ave
ChargePoint Network 2 Level 2 · J1772 (Level 2) October 2026
PG CITYLOT2 ST3
207 16th St
ChargePoint Network 2 Level 2 · J1772 (Level 2) October 2026
PG CITYLOT2 ST4
223 16th St
ChargePoint Network 2 Level 2 · J1772 (Level 2) October 2026

Spotted something out of date or missing? Report a correction.

What this means

Level 2 is the standard public and home charger (240V) — a few hours for a full charge, fine for shopping, work, or overnight. DC fast charging is the highway kind: 20–40 minutes to most of a charge, but not every station has it.

Connectors are the plug shape. J1772 is the universal Level 2 plug almost every non-Tesla EV uses. CCS and CHAdeMO are DC fast-charging plugs (CHAdeMO is older, mostly older Nissan Leafs). NACS is Tesla's plug, now the emerging US standard — many newer non-Teslas use it or an adapter.

This page summarizes NREL's own station records and is not a live availability map — a charger listed here can still be busy, broken, or behind a gate. Check the network's app before you rely on a specific plug.

Charging at home in Pacific Grove?

Most EV owners do the bulk of their charging overnight at home on a Level 2 charger. See our home EV charger buying guide for what to look for and how to match a charger to your car's connector.

EV charging near Pacific Grove

Source: U.S. DOE / NREL Alternative Fuels Data Center (AFDC) Station Locator, retrieved October 2026. Public stations only.