ChargingAtlas

CA / Rancho Cucamonga

CA · EV charging

EV charging in Rancho Cucamonga, CA

Here is what NREL's public data shows about EV charging in Rancho Cucamonga, CA. As of NREL AFDC data retrieved August 2026, Rancho Cucamonga has 28 public charging stations with 37 Level 2 ports, including 30 DC fast-charging ports for quick top-ups.

DC fast   Level 2   not recently confirmed  ·  click a marker for details, directions & Street View

Stations are operated across 5 networks: ChargePoint Network (20), Non-networked (3), Tesla (2), Blink Network (2), and 1 more.

Connectors on record: J1772 (Level 2) at 20 stations; CCS (J1772 Combo) at 6 stations; NACS / Tesla at 2 stations; CHAdeMO at 2 stations.

Of these stations, 3 are paid, per NREL's pricing field. Pricing is not recorded for the remaining 25. Always confirm current pricing with the network before you charge.

2 stations carry a NACS / Tesla connector — relevant if you drive a Tesla or a newer EV that has switched to NACS.

Notable charging stations

The largest sites by port count, DC fast first. Rancho Cucamonga has 28 public stations in all — see the map above.

StationNetworkChargingConfirmed
Rancho Cucamonga, CA - Tesla Supercharger
12642 Cultural Center Dr.
Tesla DC fast 12 DC fast · NACS / Tesla June 2026
Rancho Cucamonga, CA – Foothill Boulevard - Tesla Supercharger
12750 Foothill Boulevard
Tesla DC fast 8 DC fast · NACS / Tesla June 2026
RC SPORTS EVHUB NEAR BLG
8313 Rochester Ave
ChargePoint Network DC fast 2 DC fast · CCS (J1772 Combo) August 2026
RC SPORTS EVHUB ADA 1
8273 Rochester Ave
ChargePoint Network DC fast 2 DC fast · CCS (J1772 Combo) August 2026
RC SPORTS EVHUB MIDDLE
8303 Rochester Ave
ChargePoint Network DC fast 2 DC fast · CCS (J1772 Combo) August 2026
RC SPORTS EVHUB ADJ SWGR
8303 Rochester Avenue
ChargePoint Network DC fast 2 DC fast · CCS (J1772 Combo) August 2026
RANCHOCUCAMONGA DCFC CITY HALL
10510 Civic Center Dr
ChargePoint Network DC fast 1 DC fast · CHAdeMO, CCS (J1772 Combo) August 2026
Victoria Gardens
12505 N Mainstreet
eVgo Network DC fast 1 DC fast · CHAdeMO, CCS (J1772 Combo) August 2026
Merill Gardens at Rancho Cucamonga
9942 Highland Ave
Blink Network 4 Level 2 · J1772 (Level 2) August 2026
Nongshim America - Santa Anita - Employee Parking
9325 Santa Anita Ave
Blink Network 3 Level 2 · J1772 (Level 2) August 2026

⚠ 3 of Rancho Cucamonga's 28 stations haven't been re-confirmed by NREL in over 18 months and may be out of service — confirm in the network's app. Spotted something out of date or missing? Report a correction.

What this means

Level 2 is the standard public and home charger (240V) — a few hours for a full charge, fine for shopping, work, or overnight. DC fast charging is the highway kind: 20–40 minutes to most of a charge, but not every station has it.

Connectors are the plug shape. J1772 is the universal Level 2 plug almost every non-Tesla EV uses. CCS and CHAdeMO are DC fast-charging plugs (CHAdeMO is older, mostly older Nissan Leafs). NACS is Tesla's plug, now the emerging US standard — many newer non-Teslas use it or an adapter.

This page summarizes NREL's own station records and is not a live availability map — a charger listed here can still be busy, broken, or behind a gate. Check the network's app before you rely on a specific plug.

Charging at home in Rancho Cucamonga?

Most EV owners do the bulk of their charging overnight at home on a Level 2 charger. See our home EV charger buying guide for what to look for and how to match a charger to your car's connector.

EV charging near Rancho Cucamonga

Source: U.S. DOE / NREL Alternative Fuels Data Center (AFDC) Station Locator, retrieved August 2026. Public stations only.