CA / San Clemente
CA · EV charging
EV charging in San Clemente, CA
Here is what NREL's public data shows about EV charging in San Clemente, CA. As of NREL AFDC data retrieved August 2026, San Clemente has 19 public charging stations with 18 Level 2 ports, including 100 DC fast-charging ports for quick top-ups.
DC fast Level 2 not recently confirmed · click a marker for details, directions & Street View
- 19Public stations
- 18Level 2 ports
- 100DC fast ports
- 85%Ports that are DC fast
Stations are operated across 8 networks: ChargePoint Network (11), Tesla (2), Electrify America (1), eVgo Network (1), and 4 more.
Connectors on record: CCS (J1772 Combo) at 11 stations; CHAdeMO at 9 stations; J1772 (Level 2) at 7 stations; NACS / Tesla at 2 stations.
Of these stations, 1 are paid, per NREL's pricing field. Pricing is not recorded for the remaining 18. Always confirm current pricing with the network before you charge.
2 stations carry a NACS / Tesla connector — relevant if you drive a Tesla or a newer EV that has switched to NACS.
Notable charging stations
The largest sites by port count, DC fast first. San Clemente has 19 public stations in all — see the map above.
| Station | Network | Charging | Confirmed |
|---|---|---|---|
| San Clemente, CA - Tesla Supercharger 101 West Avenida Vista Hermosa | Tesla | DC fast 49 DC fast · NACS / Tesla | June 2026 |
| San Clemente, CA - Avenida Vista Hermosa - Tesla Supercharger 990 990 Avenida Vista Hermosa | Tesla | DC fast 16 DC fast · NACS / Tesla | June 2026 |
| San Clemente Hub 422 Avenida De La Estrella | SHELL_RECHARGE | DC fast 14 DC fast · CCS (J1772 Combo) | August 2026 |
| Ocean View Plaza 638 Camino de los Mares | eVgo Network | DC fast 10 DC fast · CHAdeMO, CCS (J1772 Combo) | August 2026 |
| Walmart 2527 (San Clemente, CA) 951 Avenida Pico | Electrify America | DC fast 3 DC fast + 1 Level 2 · J1772 (Level 2), CCS (J1772 Combo) | August 2026 |
| DC OSC DC4 101 W Avenida Vista Hermosa | ChargePoint Network | DC fast 1 DC fast · CHAdeMO, CCS (J1772 Combo) | August 2026 |
| DC OSC DC 6 101 W Avenida Vista Hermosa | ChargePoint Network | DC fast 1 DC fast · CHAdeMO, CCS (J1772 Combo) | August 2026 |
| DC OSC DC 5 101 W Avenida Vista Hermosa | ChargePoint Network | DC fast 1 DC fast · CHAdeMO, CCS (J1772 Combo) | August 2026 |
| DC OSC DC1 101 W Avenida Vista Hermosa | ChargePoint Network | DC fast 1 DC fast · CHAdeMO, CCS (J1772 Combo) | August 2026 |
| DC OSC DC3 101 W Avenida Vista Hermosa | ChargePoint Network | DC fast 1 DC fast · CHAdeMO, CCS (J1772 Combo) | August 2026 |
Spotted something out of date or missing? Report a correction.
What this means
Level 2 is the standard public and home charger (240V) — a few hours for a full charge, fine for shopping, work, or overnight. DC fast charging is the highway kind: 20–40 minutes to most of a charge, but not every station has it.
Connectors are the plug shape. J1772 is the universal Level 2 plug almost every non-Tesla EV uses. CCS and CHAdeMO are DC fast-charging plugs (CHAdeMO is older, mostly older Nissan Leafs). NACS is Tesla's plug, now the emerging US standard — many newer non-Teslas use it or an adapter.
This page summarizes NREL's own station records and is not a live availability map — a charger listed here can still be busy, broken, or behind a gate. Check the network's app before you rely on a specific plug.
Charging at home in San Clemente?
Most EV owners do the bulk of their charging overnight at home on a Level 2 charger. See our home EV charger buying guide for what to look for and how to match a charger to your car's connector.
EV charging near San Clemente
Source: U.S. DOE / NREL Alternative Fuels Data Center (AFDC) Station Locator, retrieved August 2026. Public stations only.