CT / Bridgeport
CT · EV charging
EV charging in Bridgeport, CT
Here is what NREL's public data shows about EV charging in Bridgeport, CT. As of NREL AFDC data retrieved July 2026, Bridgeport has 23 public charging stations with 74 Level 2 ports, including 18 DC fast-charging ports for quick top-ups.
DC fast Level 2 not recently confirmed · click a marker for details, directions & Street View
- 23Public stations
- 74Level 2 ports
- 18DC fast ports
- 20%Ports that are DC fast
⚡ 1 station lists free charging
Stations are operated across 6 networks: Non-networked (9), LOOP (5), ChargePoint Network (3), EVGATEWAY (3), and 2 more.
Connectors on record: J1772 (Level 2) at 20 stations; CHAdeMO at 2 stations; CCS (J1772 Combo) at 2 stations; NACS / Tesla at 1 station.
Of these stations, 1 list free charging and 5 are paid, per NREL's pricing field. Pricing is not recorded for the remaining 17. Always confirm current pricing with the network before you charge.
1 station carries a NACS / Tesla connector — relevant if you drive a Tesla or a newer EV that has switched to NACS.
Notable charging stations
The largest sites by port count, DC fast first. Bridgeport has 23 public stations in all — see the map above.
| Station | Network | Charging | Confirmed |
|---|---|---|---|
| Bridgeport, CT - Tesla Supercharger 10 E Main St | Tesla | DC fast 16 DC fast · NACS / Tesla | June 2026 |
| PARK CITY FORD PARKCITY01 65 Sylvan Ave | ChargePoint Network | DC fast 1 DC fast · CHAdeMO, CCS (J1772 Combo) | July 2026 |
| PARK CITY FORD PARKCITY02 65 Sylvan Ave | ChargePoint Network | DC fast 1 DC fast · CHAdeMO, CCS (J1772 Combo) | July 2026 |
| 855 Main St 855 Main St | Non-networked | 16 Level 2 · J1772 (Level 2) | ⚠ unknown |
| Bridgeport Hospital 267 Grant St | Non-networked | 4 Level 2 · J1772 (Level 2) | May 2026 |
| SWTCH Energy Inc. 726 Union Ave | SWTCH | 4 Level 2 · J1772 (Level 2) | ⚠ February 2024 |
| SWTCH Energy Inc. 800 Union Ave | SWTCH | 4 Level 2 · J1772 (Level 2) | ⚠ February 2024 |
| 2646 Fairfield Ave, Bridgeport 2646 Fairfield Ave | Non-networked | 4 Level 2 · J1772 (Level 2) | ⚠ May 2024 |
| 2649 Main St. Bridgeport 2649 Main St | Non-networked | 4 Level 2 · J1772 (Level 2) | ⚠ May 2024 |
| 140 Alice Street 140 Alice St | Non-networked | 4 Level 2 · J1772 (Level 2) | ⚠ May 2024 |
⚠ 10 of Bridgeport's 23 stations haven't been re-confirmed by NREL in over 18 months and may be out of service — confirm in the network's app. Spotted something out of date or missing? Report a correction.
What this means
Level 2 is the standard public and home charger (240V) — a few hours for a full charge, fine for shopping, work, or overnight. DC fast charging is the highway kind: 20–40 minutes to most of a charge, but not every station has it.
Connectors are the plug shape. J1772 is the universal Level 2 plug almost every non-Tesla EV uses. CCS and CHAdeMO are DC fast-charging plugs (CHAdeMO is older, mostly older Nissan Leafs). NACS is Tesla's plug, now the emerging US standard — many newer non-Teslas use it or an adapter.
This page summarizes NREL's own station records and is not a live availability map — a charger listed here can still be busy, broken, or behind a gate. Check the network's app before you rely on a specific plug.
Charging at home in Bridgeport?
Most EV owners do the bulk of their charging overnight at home on a Level 2 charger. See our home EV charger buying guide for what to look for and how to match a charger to your car's connector.
EV charging near Bridgeport
Source: U.S. DOE / NREL Alternative Fuels Data Center (AFDC) Station Locator, retrieved July 2026. Public stations only.