ChargingAtlas

CT / Westport

CT · EV charging

EV charging in Westport, CT

Here is what NREL's public data shows about EV charging in Westport, CT. As of NREL AFDC data retrieved July 2026, Westport has 11 public charging stations with 39 Level 2 ports, all Level 2 (no DC fast charging on record).

DC fast   Level 2   not recently confirmed  ·  click a marker for details, directions & Street View

⚡ 2 stations list free charging

Stations are operated across 3 networks: Blink Network (5), EV Connect (4), ChargePoint Network (2).

Connectors on record: J1772 (Level 2) at 11 stations.

Of these stations, 2 list free charging, per NREL's pricing field. Pricing is not recorded for the remaining 9. Always confirm current pricing with the network before you charge.

Notable charging stations

The largest sites by port count, DC fast first. Westport has 11 public stations in all — see the map above.

StationNetworkChargingConfirmed
Baldwin Parking Lot
35 Elm Street
EV Connect 12 Level 2 · J1772 (Level 2) July 2026
Saugatuck Station – Lot 1
Park Street
Blink Network 7 Level 2 · J1772 (Level 2) July 2026
Saugatuck Railroad Station Lot #3
1 Ferry Ln
EV Connect 4 Level 2 · J1772 (Level 2) July 2026
Saugatuck Station – Lot 3
1 Ferry Lane
Blink Network 3 Level 2 · J1772 (Level 2) July 2026
GFA STATION NORTH
35 Beachside Ave
ChargePoint Network 2 Level 2 · J1772 (Level 2) July 2026
GFA STATION SOUTH
35 Beachside Ave
ChargePoint Network 2 Level 2 · J1772 (Level 2) July 2026
Greens Farms Railroad Station Lot #1
New Creek Rd
Blink Network 2 Level 2 · J1772 (Level 2) July 2026
The Westport Library
20 Jesup Rd
EV Connect 2 Level 2 · J1772 (Level 2) July 2026
Fire HQ
515 Post Rd East
EV Connect 2 Level 2 · J1772 (Level 2) July 2026
Town of Westport
110 Myrtle Avenue
Blink Network 2 Level 2 · J1772 (Level 2) July 2026

Spotted something out of date or missing? Report a correction.

What this means

Level 2 is the standard public and home charger (240V) — a few hours for a full charge, fine for shopping, work, or overnight. DC fast charging is the highway kind: 20–40 minutes to most of a charge, but not every station has it.

Connectors are the plug shape. J1772 is the universal Level 2 plug almost every non-Tesla EV uses. CCS and CHAdeMO are DC fast-charging plugs (CHAdeMO is older, mostly older Nissan Leafs). NACS is Tesla's plug, now the emerging US standard — many newer non-Teslas use it or an adapter.

This page summarizes NREL's own station records and is not a live availability map — a charger listed here can still be busy, broken, or behind a gate. Check the network's app before you rely on a specific plug.

Charging at home in Westport?

Most EV owners do the bulk of their charging overnight at home on a Level 2 charger. See our home EV charger buying guide for what to look for and how to match a charger to your car's connector.

EV charging near Westport

Source: U.S. DOE / NREL Alternative Fuels Data Center (AFDC) Station Locator, retrieved July 2026. Public stations only.