FL / Apopka
FL · EV charging
EV charging in Apopka, FL
Here is what NREL's public data shows about EV charging in Apopka, FL. As of NREL AFDC data retrieved July 2026, Apopka has 11 public charging stations with 30 Level 2 ports, including 24 DC fast-charging ports for quick top-ups.
DC fast Level 2 not recently confirmed · click a marker for details, directions & Street View
- 11Public stations
- 30Level 2 ports
- 24DC fast ports
- 44%Ports that are DC fast
Stations are operated across 6 networks: ChargePoint Network (4), CHARGEUP (3), Tesla (1), eVgo Network (1), and 2 more.
Connectors on record: J1772 (Level 2) at 9 stations; CCS (J1772 Combo) at 3 stations; NACS / Tesla at 1 station; CHAdeMO at 1 station.
1 station carries a NACS / Tesla connector — relevant if you drive a Tesla or a newer EV that has switched to NACS.
Notable charging stations
The largest sites by port count, DC fast first. Apopka has 11 public stations in all — see the map above.
| Station | Network | Charging | Confirmed |
|---|---|---|---|
| Apopka, FL - Tesla Supercharger 1615 South Orange Blossom Trail | Tesla | DC fast 8 DC fast · NACS / Tesla | June 2026 |
| Apopka Square 807 E Semoran Blvd # 899 | eVgo Network | DC fast 8 DC fast · CHAdeMO, CCS (J1772 Combo) | July 2026 |
| Mullinax Ford of Apopka 1551 E. Semoran Blvd. | SYNERGEV | DC fast 6 DC fast + 5 Level 2 · J1772 (Level 2), CCS (J1772 Combo) | July 2026 |
| Assembly Room 2360 Clark St. | CHARGEUP | DC fast 2 DC fast + 1 Level 2 · J1772 (Level 2), CCS (J1772 Combo) | July 2026 |
| Summer House at Lake Apopka 1250 Marden Rd | CHARGEUP | 8 Level 2 · J1772 (Level 2) | July 2026 |
| Marden Ridge Luxury Apartments 1595 Marden Ridge Loop | CHARGEUP | 6 Level 2 · J1772 (Level 2) | July 2026 |
| CITY OF APOPKA CITYOFAPOPKA PS 748 E Cleveland St | ChargePoint Network | 2 Level 2 · J1772 (Level 2) | July 2026 |
| St. Johns River Water Management District 2501 South Binion Road | Blink Network | 2 Level 2 · J1772 (Level 2) | July 2026 |
| APEX APOPKA 1851 PEAK CIR 1851 Peak Circle | ChargePoint Network | 2 Level 2 · J1772 (Level 2) | July 2026 |
| APEX APOPKA 1785 PEAK CIR 1785 Peak Circle | ChargePoint Network | 2 Level 2 · J1772 (Level 2) | July 2026 |
Spotted something out of date or missing? Report a correction.
What this means
Level 2 is the standard public and home charger (240V) — a few hours for a full charge, fine for shopping, work, or overnight. DC fast charging is the highway kind: 20–40 minutes to most of a charge, but not every station has it.
Connectors are the plug shape. J1772 is the universal Level 2 plug almost every non-Tesla EV uses. CCS and CHAdeMO are DC fast-charging plugs (CHAdeMO is older, mostly older Nissan Leafs). NACS is Tesla's plug, now the emerging US standard — many newer non-Teslas use it or an adapter.
This page summarizes NREL's own station records and is not a live availability map — a charger listed here can still be busy, broken, or behind a gate. Check the network's app before you rely on a specific plug.
Charging at home in Apopka?
Most EV owners do the bulk of their charging overnight at home on a Level 2 charger. See our home EV charger buying guide for what to look for and how to match a charger to your car's connector.
EV charging near Apopka
Source: U.S. DOE / NREL Alternative Fuels Data Center (AFDC) Station Locator, retrieved July 2026. Public stations only.