ChargingAtlas

FL / Deerfield Beach

FL · EV charging

EV charging in Deerfield Beach, FL

Here is what NREL's public data shows about EV charging in Deerfield Beach, FL. As of NREL AFDC data retrieved July 2026, Deerfield Beach has 16 public charging stations with 31 Level 2 ports, including 16 DC fast-charging ports for quick top-ups.

DC fast   Level 2   not recently confirmed  ·  click a marker for details, directions & Street View

⚡ 1 station lists free charging

Stations are operated across 9 networks: ChargePoint Network (8), Tesla Destination (1), Tesla (1), Electrify America (1), and 5 more.

Connectors on record: J1772 (Level 2) at 12 stations; NACS / Tesla at 3 stations; CCS (J1772 Combo) at 2 stations.

Of these stations, 1 list free charging and 2 are paid, per NREL's pricing field. Pricing is not recorded for the remaining 13. Always confirm current pricing with the network before you charge.

3 stations carry a NACS / Tesla connector — relevant if you drive a Tesla or a newer EV that has switched to NACS.

Notable charging stations

The largest sites by port count, DC fast first. Deerfield Beach has 16 public stations in all — see the map above.

StationNetworkChargingConfirmed
Deerfield Beach, FL - Tesla Supercharger
20 SW 12th Avenue
Tesla DC fast 8 DC fast · NACS / Tesla June 2026
Target T1337 (Deerfield, FL)
1200 S Federal Hwy
Electrify America DC fast 4 DC fast · CCS (J1772 Combo) July 2026
7Charge - Deerfield Beach 34782
901 W Sample Rd
7CHARGE DC fast 4 DC fast · CCS (J1772 Combo), NACS / Tesla February 2026
The Enclave Apartments at Waterways
4359 SW 10th Pl
LOOP 6 Level 2 · J1772 (Level 2) March 2026
Bernard Adams Municipal Complex
401 SW 4th Street
CHARGEUP 4 Level 2 · J1772 (Level 2) July 2026
USA Deerfield Parking Garage
123 NE 20th Avenue
Blink Network 3 Level 2 · J1772 (Level 2) July 2026
ACTIVITY CENTER CVE ACTIVITY
3501 West Drive
ChargePoint Network 2 Level 2 · J1772 (Level 2) July 2026
PEOPLES TRUST18 STATION 4
18 people'sTrust Way
ChargePoint Network 2 Level 2 · J1772 (Level 2) July 2026
PEOPLES TRUST18 STATION 1
18 People's Trust Way
ChargePoint Network 2 Level 2 · J1772 (Level 2) July 2026
PEOPLES TRUST18 STATION 5
18 People's Trust Way
ChargePoint Network 2 Level 2 · J1772 (Level 2) July 2026

⚠ 1 of Deerfield Beach's 16 stations haven't been re-confirmed by NREL in over 18 months and may be out of service — confirm in the network's app. Spotted something out of date or missing? Report a correction.

What this means

Level 2 is the standard public and home charger (240V) — a few hours for a full charge, fine for shopping, work, or overnight. DC fast charging is the highway kind: 20–40 minutes to most of a charge, but not every station has it.

Connectors are the plug shape. J1772 is the universal Level 2 plug almost every non-Tesla EV uses. CCS and CHAdeMO are DC fast-charging plugs (CHAdeMO is older, mostly older Nissan Leafs). NACS is Tesla's plug, now the emerging US standard — many newer non-Teslas use it or an adapter.

This page summarizes NREL's own station records and is not a live availability map — a charger listed here can still be busy, broken, or behind a gate. Check the network's app before you rely on a specific plug.

Charging at home in Deerfield Beach?

Most EV owners do the bulk of their charging overnight at home on a Level 2 charger. See our home EV charger buying guide for what to look for and how to match a charger to your car's connector.

EV charging near Deerfield Beach

Source: U.S. DOE / NREL Alternative Fuels Data Center (AFDC) Station Locator, retrieved July 2026. Public stations only.