FL / North Miami
FL · EV charging
EV charging in North Miami, FL
Here is what NREL's public data shows about EV charging in North Miami, FL. As of NREL AFDC data retrieved October 2026, North Miami has 16 public charging stations with 55 Level 2 ports, all Level 2 (no DC fast charging on record).
DC fast Level 2 not recently confirmed · click a marker for details, directions & Street View
- 16Public stations
- 55Level 2 ports
- 0DC fast ports
- 0%Ports that are DC fast
Stations are operated across 3 networks: ChargePoint Network (13), Blink Network (2), EVGATEWAY (1).
Connectors on record: J1772 (Level 2) at 16 stations.
How North Miami compares
- 2.6 public stations per 10,000 residents — 1.4× the Florida rate (1.9).
- 0 DC fast ports per 10,000 residents (Florida: 2.3).
Last verified: NREL confirmed 100% of North Miami's stations in the 12 months before this snapshot, most recently in October 2026.
Population: U.S. Census Bureau, Vintage 2024 population estimates (62,202 residents; Florida 23,372,215). Station counts use NREL's address city, which can extend past city limits, so rates are approximate.
Notable charging stations
The largest sites by port count, DC fast first. North Miami has 16 public stations in all — see the map above.
| Station | Network | Charging | Confirmed |
|---|---|---|---|
| Villa Laguna Sole Mia Way | Blink Network | 16 Level 2 · J1772 (Level 2) | October 2026 |
| Manor Biscayne 1650 Northeast 124th Street | Blink Network | 16 Level 2 · J1772 (Level 2) | October 2026 |
| OBE 151 BISCAYNE WM 15051 Royal Oak Ln | ChargePoint Network | 2 Level 2 · J1772 (Level 2) | October 2026 |
| OBE CITY N MIAMI 738 NE 125th St | ChargePoint Network | 2 Level 2 · J1772 (Level 2) | October 2026 |
| OBE 151 BISCAYNE BO 15051 Royal Oak Ln | ChargePoint Network | 2 Level 2 · J1772 (Level 2) | October 2026 |
| Klaus Parking Systems Atlantic 1290 NE 125th St | EVGATEWAY | 2 Level 2 · J1772 (Level 2) | October 2026 |
| OBE GARDENS RES NE 1155 Northeast 126th Street | ChargePoint Network | 2 Level 2 · J1772 (Level 2) | October 2026 |
| OBE GARDENS RES SE 1155 Northeast 126th Street | ChargePoint Network | 2 Level 2 · J1772 (Level 2) | October 2026 |
| OBE GARDENS RES NW 1155 Northeast 126th Street | ChargePoint Network | 2 Level 2 · J1772 (Level 2) | October 2026 |
| OBE GARDENS RES SW 1155 Northeast 126th Street | ChargePoint Network | 2 Level 2 · J1772 (Level 2) | October 2026 |
Spotted something out of date or missing? Report a correction.
What this means
Level 2 is the standard public and home charger (240V) — a few hours for a full charge, fine for shopping, work, or overnight. DC fast charging is the highway kind: 20–40 minutes to most of a charge, but not every station has it.
Connectors are the plug shape. J1772 is the universal Level 2 plug almost every non-Tesla EV uses. CCS and CHAdeMO are DC fast-charging plugs (CHAdeMO is older, mostly older Nissan Leafs). NACS is Tesla's plug, now the emerging US standard — many newer non-Teslas use it or an adapter.
This page summarizes NREL's own station records and is not a live availability map — a charger listed here can still be busy, broken, or behind a gate. Check the network's app before you rely on a specific plug.
Charging at home in North Miami?
Most EV owners do the bulk of their charging overnight at home on a Level 2 charger. See our home EV charger buying guide for what to look for and how to match a charger to your car's connector.
EV charging near North Miami
Source: U.S. DOE / NREL Alternative Fuels Data Center (AFDC) Station Locator, retrieved October 2026. Public stations only.