ChargingAtlas

FL / Plant City

FL · EV charging

EV charging in Plant City, FL

Here is what NREL's public data shows about EV charging in Plant City, FL. As of NREL AFDC data retrieved July 2026, Plant City has 16 public charging stations with 30 Level 2 ports, including 12 DC fast-charging ports for quick top-ups.

DC fast   Level 2   not recently confirmed  ·  click a marker for details, directions & Street View

⚡ 1 station lists free charging

Stations are operated across 7 networks: ChargePoint Network (10), Tesla Destination (1), Non-networked (1), Tesla (1), and 3 more.

Connectors on record: J1772 (Level 2) at 14 stations; NACS / Tesla at 2 stations; CCS (J1772 Combo) at 2 stations.

Of these stations, 1 list free charging and 1 are paid, per NREL's pricing field. Pricing is not recorded for the remaining 14. Always confirm current pricing with the network before you charge.

2 stations carry a NACS / Tesla connector — relevant if you drive a Tesla or a newer EV that has switched to NACS.

Notable charging stations

The largest sites by port count, DC fast first. Plant City has 16 public stations in all — see the map above.

StationNetworkChargingConfirmed
Plant City, FL - Tesla Supercharger
2705 Thonotosassa Road
Tesla DC fast 8 DC fast · NACS / Tesla June 2026
Jarrett-Scott Ford
2000 E Baker St
Non-networked DC fast 2 DC fast + 1 Level 2 · J1772 (Level 2), CCS (J1772 Combo) May 2025
Jarrett Scott Ford
2000 E Baker St
FORD_CHARGE DC fast 2 DC fast · CCS (J1772 Combo) July 2026
Century Lakehouse
3003 S Frontage Rd
LOOP 6 Level 2 · J1772 (Level 2) April 2026
Plant City Main Office
405 W Dr Martin Luther King Jr Blvd
CHARGEUP 4 Level 2 · J1772 (Level 2) July 2026
HILLS COUNTY PLANT CITY 1
301 N Michigan Ave
ChargePoint Network 2 Level 2 · J1772 (Level 2) July 2026
Hampton Inn Plant City - Tesla Destination
2702 Thonotosassa Rd
Tesla Destination 2 Level 2 · J1772 (Level 2), NACS / Tesla ⚠ July 2024
CITY FURNITURE PC SHOWROOM 2
3205 S Frontage Rd
ChargePoint Network 2 Level 2 · J1772 (Level 2) July 2026
CITY FURNITURE PC SHOWROOM 3
3205 S Frontage Rd
ChargePoint Network 2 Level 2 · J1772 (Level 2) July 2026
CITY FURNITURE PC SHOWROOM 4
3214 N Frontage Rd
ChargePoint Network 2 Level 2 · J1772 (Level 2) July 2026

⚠ 1 of Plant City's 16 stations haven't been re-confirmed by NREL in over 18 months and may be out of service — confirm in the network's app. Spotted something out of date or missing? Report a correction.

What this means

Level 2 is the standard public and home charger (240V) — a few hours for a full charge, fine for shopping, work, or overnight. DC fast charging is the highway kind: 20–40 minutes to most of a charge, but not every station has it.

Connectors are the plug shape. J1772 is the universal Level 2 plug almost every non-Tesla EV uses. CCS and CHAdeMO are DC fast-charging plugs (CHAdeMO is older, mostly older Nissan Leafs). NACS is Tesla's plug, now the emerging US standard — many newer non-Teslas use it or an adapter.

This page summarizes NREL's own station records and is not a live availability map — a charger listed here can still be busy, broken, or behind a gate. Check the network's app before you rely on a specific plug.

Charging at home in Plant City?

Most EV owners do the bulk of their charging overnight at home on a Level 2 charger. See our home EV charger buying guide for what to look for and how to match a charger to your car's connector.

EV charging near Plant City

Source: U.S. DOE / NREL Alternative Fuels Data Center (AFDC) Station Locator, retrieved July 2026. Public stations only.