GA / Newnan
GA · EV charging
EV charging in Newnan, GA
Here is what NREL's public data shows about EV charging in Newnan, GA. As of NREL AFDC data retrieved July 2026, Newnan has 14 public charging stations with 15 Level 2 ports, including 21 DC fast-charging ports for quick top-ups.
DC fast Level 2 not recently confirmed · click a marker for details, directions & Street View
- 14Public stations
- 15Level 2 ports
- 21DC fast ports
- 58%Ports that are DC fast
⚡ 4 stations list free charging
Stations are operated across 6 networks: ChargePoint Network (5), Non-networked (4), Blink Network (2), Tesla Destination (1), and 2 more.
Connectors on record: J1772 (Level 2) at 7 stations; CCS (J1772 Combo) at 6 stations; NACS / Tesla at 6 stations; CHAdeMO at 1 station.
Of these stations, 4 list free charging, per NREL's pricing field. Pricing is not recorded for the remaining 10. Always confirm current pricing with the network before you charge.
6 stations carry a NACS / Tesla connector — relevant if you drive a Tesla or a newer EV that has switched to NACS.
Notable charging stations
The largest sites by port count, DC fast first. Newnan has 14 public stations in all — see the map above.
| Station | Network | Charging | Confirmed |
|---|---|---|---|
| Newnan, GA - Tesla Supercharger 555 Bullsboro Drive | Tesla | DC fast 12 DC fast · NACS / Tesla | June 2026 |
| Newnan 955 Bullsboro Dr | EV Connect | DC fast 4 DC fast · CCS (J1772 Combo) | July 2026 |
| Nissan of Newnan 783 Bullsboro Dr | Non-networked | DC fast 1 DC fast + 1 Level 2 · CHAdeMO, J1772 (Level 2), CCS (J1772 Combo) | January 2026 |
| OPTIMUS ENERGY NEWNAN BK DC2 856 Poplar Road | ChargePoint Network | DC fast 1 DC fast · CCS (J1772 Combo), NACS / Tesla | July 2026 |
| OPTIMUS ENERGY NEWNAN BK DC4 856 Poplar Road | ChargePoint Network | DC fast 1 DC fast · CCS (J1772 Combo), NACS / Tesla | July 2026 |
| OPTIMUS ENERGY NEWNAN BK DC1 856 Poplar Road | ChargePoint Network | DC fast 1 DC fast · CCS (J1772 Combo), NACS / Tesla | July 2026 |
| OPTIMUS ENERGY NEWNAN BK DC3 856 Poplar Road | ChargePoint Network | DC fast 1 DC fast · CCS (J1772 Combo), NACS / Tesla | July 2026 |
| McDaniels Acura of Newnan 8000 McIntosh Parkway | Blink Network | 3 Level 2 · J1772 (Level 2) | July 2026 |
| Carl Miller Park 74 Sewell Rd | Non-networked | 2 Level 2 · J1772 (Level 2) | August 2025 |
| Newnan Utilities Wahoo Creek Administration Building 315 Millard Farmer Industrial Blvd | Non-networked | 2 Level 2 · J1772 (Level 2) | ⚠ August 2024 |
⚠ 2 of Newnan's 14 stations haven't been re-confirmed by NREL in over 18 months and may be out of service — confirm in the network's app. Spotted something out of date or missing? Report a correction.
What this means
Level 2 is the standard public and home charger (240V) — a few hours for a full charge, fine for shopping, work, or overnight. DC fast charging is the highway kind: 20–40 minutes to most of a charge, but not every station has it.
Connectors are the plug shape. J1772 is the universal Level 2 plug almost every non-Tesla EV uses. CCS and CHAdeMO are DC fast-charging plugs (CHAdeMO is older, mostly older Nissan Leafs). NACS is Tesla's plug, now the emerging US standard — many newer non-Teslas use it or an adapter.
This page summarizes NREL's own station records and is not a live availability map — a charger listed here can still be busy, broken, or behind a gate. Check the network's app before you rely on a specific plug.
Charging at home in Newnan?
Most EV owners do the bulk of their charging overnight at home on a Level 2 charger. See our home EV charger buying guide for what to look for and how to match a charger to your car's connector.
EV charging near Newnan
Source: U.S. DOE / NREL Alternative Fuels Data Center (AFDC) Station Locator, retrieved July 2026. Public stations only.