ChargingAtlas

IL / Barrington

IL · EV charging

EV charging in Barrington, IL

Here is what NREL's public data shows about EV charging in Barrington, IL. As of NREL AFDC data retrieved July 2026, Barrington has 16 public charging stations with 24 Level 2 ports, including 6 DC fast-charging ports for quick top-ups.

DC fast   Level 2   not recently confirmed  ·  click a marker for details, directions & Street View

Stations are operated across 4 networks: ChargePoint Network (12), Blink Network (2), AMPUP (1), ZEFNET (1).

Connectors on record: J1772 (Level 2) at 13 stations; CCS (J1772 Combo) at 3 stations.

Of these stations, 1 are paid, per NREL's pricing field. Pricing is not recorded for the remaining 15. Always confirm current pricing with the network before you charge.

Notable charging stations

The largest sites by port count, DC fast first. Barrington has 16 public stations in all — see the map above.

StationNetworkChargingConfirmed
Wickstrom Auto Group - DCFC
600 W Northwest Highway
Blink Network DC fast 4 DC fast · CCS (J1772 Combo) July 2026
MOTORWERKS1475 DC FAST 04
1475 Barrington Rd
ChargePoint Network DC fast 1 DC fast · CCS (J1772 Combo) July 2026
MOTORWERKS1475 DC FAST 02
1475 Barrington Rd
ChargePoint Network DC fast 1 DC fast · CCS (J1772 Combo) July 2026
LED-LLC - BreezEV
188 S Northwest Hwy
AMPUP 3 Level 2 · J1772 (Level 2) ⚠ June 2023
101 W Liberty
101 West Liberty Street
ZEFNET 3 Level 2 · J1772 (Level 2) July 2026
MOTORWERKS1475 STATION 8
1475 Barrington Rd
ChargePoint Network 2 Level 2 · J1772 (Level 2) July 2026
ADVOCATE SHEP FITNESS
1301 S Barrington Rd
ChargePoint Network 2 Level 2 · J1772 (Level 2) July 2026
MOTORWERKS1475 STATION 9
1475 Barrington Rd
ChargePoint Network 2 Level 2 · J1772 (Level 2) July 2026
MOTORWERKS1475 STATION 11
1475 Barrington Rd
ChargePoint Network 2 Level 2 · J1772 (Level 2) July 2026
MOTORWERKS1475 STATION 3
1475 Barrington Rd
ChargePoint Network 2 Level 2 · J1772 (Level 2) July 2026

⚠ 1 of Barrington's 16 stations haven't been re-confirmed by NREL in over 18 months and may be out of service — confirm in the network's app. Spotted something out of date or missing? Report a correction.

What this means

Level 2 is the standard public and home charger (240V) — a few hours for a full charge, fine for shopping, work, or overnight. DC fast charging is the highway kind: 20–40 minutes to most of a charge, but not every station has it.

Connectors are the plug shape. J1772 is the universal Level 2 plug almost every non-Tesla EV uses. CCS and CHAdeMO are DC fast-charging plugs (CHAdeMO is older, mostly older Nissan Leafs). NACS is Tesla's plug, now the emerging US standard — many newer non-Teslas use it or an adapter.

This page summarizes NREL's own station records and is not a live availability map — a charger listed here can still be busy, broken, or behind a gate. Check the network's app before you rely on a specific plug.

Charging at home in Barrington?

Most EV owners do the bulk of their charging overnight at home on a Level 2 charger. See our home EV charger buying guide for what to look for and how to match a charger to your car's connector.

EV charging near Barrington

Source: U.S. DOE / NREL Alternative Fuels Data Center (AFDC) Station Locator, retrieved July 2026. Public stations only.