IL / Edwardsville
IL · EV charging
EV charging in Edwardsville, IL
Here is what NREL's public data shows about EV charging in Edwardsville, IL. As of NREL AFDC data retrieved July 2026, Edwardsville has 11 public charging stations with 26 Level 2 ports, including 12 DC fast-charging ports for quick top-ups.
DC fast Level 2 not recently confirmed · click a marker for details, directions & Street View
- 11Public stations
- 26Level 2 ports
- 12DC fast ports
- 32%Ports that are DC fast
Stations are operated across 3 networks: ChargePoint Network (9), Blink Network (1), Tesla (1).
Connectors on record: J1772 (Level 2) at 10 stations; NACS / Tesla at 1 station.
1 station carries a NACS / Tesla connector — relevant if you drive a Tesla or a newer EV that has switched to NACS.
Notable charging stations
The largest sites by port count, DC fast first. Edwardsville has 11 public stations in all — see the map above.
| Station | Network | Charging | Confirmed |
|---|---|---|---|
| Edwardsville, IL - Tesla Supercharger 1041 Century Dr | Tesla | DC fast 12 DC fast · NACS / Tesla | June 2026 |
| Main Location 108 Gateway Commerce Center Drive North | Blink Network | 8 Level 2 · J1772 (Level 2) | July 2026 |
| SIUE LOT A Lot A (North of Lovejoy Library) | ChargePoint Network | 2 Level 2 · J1772 (Level 2) | July 2026 |
| SWEC_ SWEC_ANDR1 3403 Anderson Healthcare Dr. | ChargePoint Network | 2 Level 2 · J1772 (Level 2) | July 2026 |
| SWEC_ SWEC_ANDG1 3403 Anderson Healthcare Dr. | ChargePoint Network | 2 Level 2 · J1772 (Level 2) | July 2026 |
| SWEC_ SWEC_ANDG4 3417 District Dr | ChargePoint Network | 2 Level 2 · J1772 (Level 2) | July 2026 |
| SWEC_ SWEC_ANDG2 100 District Dr | ChargePoint Network | 2 Level 2 · J1772 (Level 2) | July 2026 |
| SWEC_ SWEC_ANDG3 100 District Dr | ChargePoint Network | 2 Level 2 · J1772 (Level 2) | July 2026 |
| SIUE LOT B Lot B (West of MUC) | ChargePoint Network | 2 Level 2 · J1772 (Level 2) | July 2026 |
| SIUE LOT E Lot E (West of Dunham Hall) | ChargePoint Network | 2 Level 2 · J1772 (Level 2) | July 2026 |
Spotted something out of date or missing? Report a correction.
What this means
Level 2 is the standard public and home charger (240V) — a few hours for a full charge, fine for shopping, work, or overnight. DC fast charging is the highway kind: 20–40 minutes to most of a charge, but not every station has it.
Connectors are the plug shape. J1772 is the universal Level 2 plug almost every non-Tesla EV uses. CCS and CHAdeMO are DC fast-charging plugs (CHAdeMO is older, mostly older Nissan Leafs). NACS is Tesla's plug, now the emerging US standard — many newer non-Teslas use it or an adapter.
This page summarizes NREL's own station records and is not a live availability map — a charger listed here can still be busy, broken, or behind a gate. Check the network's app before you rely on a specific plug.
Charging at home in Edwardsville?
Most EV owners do the bulk of their charging overnight at home on a Level 2 charger. See our home EV charger buying guide for what to look for and how to match a charger to your car's connector.
EV charging near Edwardsville
Source: U.S. DOE / NREL Alternative Fuels Data Center (AFDC) Station Locator, retrieved July 2026. Public stations only.