IL / Elk Grove Village
IL · EV charging
EV charging in Elk Grove Village, IL
Here is what NREL's public data shows about EV charging in Elk Grove Village, IL. As of NREL AFDC data retrieved July 2026, Elk Grove Village has 10 public charging stations with 18 Level 2 ports, including 6 DC fast-charging ports for quick top-ups.
DC fast Level 2 not recently confirmed · click a marker for details, directions & Street View
- 10Public stations
- 18Level 2 ports
- 6DC fast ports
- 25%Ports that are DC fast
⚡ 1 station lists free charging
Stations are operated across 4 networks: ChargePoint Network (4), Tesla Destination (3), Non-networked (2), BP_PULSE (1).
Connectors on record: J1772 (Level 2) at 8 stations; NACS / Tesla at 3 stations; CCS (J1772 Combo) at 2 stations.
Of these stations, 1 list free charging and 1 are paid, per NREL's pricing field. Pricing is not recorded for the remaining 8. Always confirm current pricing with the network before you charge.
3 stations carry a NACS / Tesla connector — relevant if you drive a Tesla or a newer EV that has switched to NACS.
Notable charging stations
The largest sites by port count, DC fast first. Elk Grove Village has 10 public stations in all — see the map above.
| Station | Network | Charging | Confirmed |
|---|---|---|---|
| Thorntons, York Rd, Elk Grove Village, IL 2310 York Rd | BP_PULSE | DC fast 4 DC fast · CCS (J1772 Combo) | July 2026 |
| Castle Chevrolet N 175 N Arlington Heights Rd | Non-networked | DC fast 2 DC fast · CCS (J1772 Combo) | September 2025 |
| Best Western O'Hare North/Elk Grove Hotel - Tesla Destination 100 Busse Rd | Tesla Destination | 3 Level 2 · J1772 (Level 2), NACS / Tesla | ⚠ July 2024 |
| Holiday Inn Chicago-Elk Grove - Tesla Destination 1000 Busse Rd | Tesla Destination | 3 Level 2 · J1772 (Level 2), NACS / Tesla | ⚠ July 2024 |
| Super 8 O'Hare Elk Grove - Tesla Destination 2951 Touhy Ave | Tesla Destination | 3 Level 2 · J1772 (Level 2), NACS / Tesla | ⚠ July 2024 |
| DISTRICT 214 EGHS 1 500 W Elk Grove Blvd | ChargePoint Network | 2 Level 2 · J1772 (Level 2) | July 2026 |
| DISTRICT 214 EGHS 2 500 W Elk Grove Blvd | ChargePoint Network | 2 Level 2 · J1772 (Level 2) | July 2026 |
| DISTRICT 214 EGHS 3 500 W Elk Grove Blvd | ChargePoint Network | 2 Level 2 · J1772 (Level 2) | July 2026 |
| FPDCC BUSSE WOOD ST1 30104 Busse Forest Nature Preserve | ChargePoint Network | 2 Level 2 · J1772 (Level 2) | July 2026 |
| Nextech Showroom & Warehouse 880 Cambridge Dr | Non-networked | 1 Level 2 · J1772 (Level 2) | May 2025 |
⚠ 3 of Elk Grove Village's 10 stations haven't been re-confirmed by NREL in over 18 months and may be out of service — confirm in the network's app. Spotted something out of date or missing? Report a correction.
What this means
Level 2 is the standard public and home charger (240V) — a few hours for a full charge, fine for shopping, work, or overnight. DC fast charging is the highway kind: 20–40 minutes to most of a charge, but not every station has it.
Connectors are the plug shape. J1772 is the universal Level 2 plug almost every non-Tesla EV uses. CCS and CHAdeMO are DC fast-charging plugs (CHAdeMO is older, mostly older Nissan Leafs). NACS is Tesla's plug, now the emerging US standard — many newer non-Teslas use it or an adapter.
This page summarizes NREL's own station records and is not a live availability map — a charger listed here can still be busy, broken, or behind a gate. Check the network's app before you rely on a specific plug.
Charging at home in Elk Grove Village?
Most EV owners do the bulk of their charging overnight at home on a Level 2 charger. See our home EV charger buying guide for what to look for and how to match a charger to your car's connector.
EV charging near Elk Grove Village
Source: U.S. DOE / NREL Alternative Fuels Data Center (AFDC) Station Locator, retrieved July 2026. Public stations only.