IL / Macomb
IL · EV charging
EV charging in Macomb, IL
Here is what NREL's public data shows about EV charging in Macomb, IL. As of NREL AFDC data retrieved July 2026, Macomb has 5 public charging stations with 8 Level 2 ports, including 1 DC fast-charging port for quick top-ups.
DC fast Level 2 not recently confirmed · click a marker for details, directions & Street View
- 5Public stations
- 8Level 2 ports
- 1DC fast ports
- 11%Ports that are DC fast
⚡ 1 station lists free charging
Stations are operated across 3 networks: ChargePoint Network (3), Non-networked (1), EV Connect (1).
Connectors on record: J1772 (Level 2) at 5 stations; NEMA 14-50 (Level 2) at 1 station; CCS (J1772 Combo) at 1 station.
Of these stations, 1 list free charging, per NREL's pricing field. Pricing is not recorded for the remaining 4. Always confirm current pricing with the network before you charge.
Notable charging stations
The largest sites by port count, DC fast first. Macomb has 5 public stations in all — see the map above.
| Station | Network | Charging | Confirmed |
|---|---|---|---|
| K07 Kunes Auto Group of Macomb 3200 E Jackson Rd | EV Connect | DC fast 1 DC fast + 1 Level 2 · J1772 (Level 2), CCS (J1772 Combo) | July 2026 |
| MACOMB CALHOUNCAMP 312 East Calhoun Street | ChargePoint Network | 2 Level 2 · J1772 (Level 2) | July 2026 |
| MACOMB AL COOPER 114 West Jackson Street | ChargePoint Network | 2 Level 2 · J1772 (Level 2) | July 2026 |
| MACOMB CITY CENTER 345 North Randolph Street | ChargePoint Network | 2 Level 2 · J1772 (Level 2) | July 2026 |
| First Presbyterian Church 400 E Carroll St | Non-networked | 1 Level 2 · J1772 (Level 2), NEMA 14-50 (Level 2) | October 2025 |
Spotted something out of date or missing? Report a correction.
What this means
Level 2 is the standard public and home charger (240V) — a few hours for a full charge, fine for shopping, work, or overnight. DC fast charging is the highway kind: 20–40 minutes to most of a charge, but not every station has it.
Connectors are the plug shape. J1772 is the universal Level 2 plug almost every non-Tesla EV uses. CCS and CHAdeMO are DC fast-charging plugs (CHAdeMO is older, mostly older Nissan Leafs). NACS is Tesla's plug, now the emerging US standard — many newer non-Teslas use it or an adapter.
This page summarizes NREL's own station records and is not a live availability map — a charger listed here can still be busy, broken, or behind a gate. Check the network's app before you rely on a specific plug.
Charging at home in Macomb?
Most EV owners do the bulk of their charging overnight at home on a Level 2 charger. See our home EV charger buying guide for what to look for and how to match a charger to your car's connector.
EV charging near Macomb
Source: U.S. DOE / NREL Alternative Fuels Data Center (AFDC) Station Locator, retrieved July 2026. Public stations only.