IL / Mattoon
IL · EV charging
EV charging in Mattoon, IL
Here is what NREL's public data shows about EV charging in Mattoon, IL. As of NREL AFDC data retrieved July 2026, Mattoon has 17 public charging stations with 24 Level 2 ports, including 7 DC fast-charging ports for quick top-ups.
DC fast Level 2 not recently confirmed · click a marker for details, directions & Street View
- 17Public stations
- 24Level 2 ports
- 7DC fast ports
- 23%Ports that are DC fast
⚡ 1 station lists free charging
Stations are operated across 4 networks: ChargePoint Network (11), Non-networked (2), TURNONGREEN (2), Blink Network (2).
Connectors on record: J1772 (Level 2) at 12 stations; CCS (J1772 Combo) at 5 stations; CHAdeMO at 3 stations; NACS / Tesla at 1 station.
Of these stations, 1 list free charging, per NREL's pricing field. Pricing is not recorded for the remaining 16. Always confirm current pricing with the network before you charge.
1 station carries a NACS / Tesla connector — relevant if you drive a Tesla or a newer EV that has switched to NACS.
Notable charging stations
The largest sites by port count, DC fast first. Mattoon has 17 public stations in all — see the map above.
| Station | Network | Charging | Confirmed |
|---|---|---|---|
| Pilson Chrysler Dodge Jeep RAM-L3 2212 Lake Land Blvd | Blink Network | DC fast 2 DC fast · CCS (J1772 Combo) | July 2026 |
| Pilson Ford-L3 2000 Lake Land Boulevard | Blink Network | DC fast 2 DC fast · CCS (J1772 Combo) | July 2026 |
| KC Summers Nissan 2404 Lake Land Blvd | Non-networked | DC fast 1 DC fast + 1 Level 2 · CHAdeMO, J1772 (Level 2), CCS (J1772 Combo) | January 2026 |
| KC EV 1 LVL 3 HYUN NE 2011 Charleston Ave | ChargePoint Network | DC fast 1 DC fast · CHAdeMO, CCS (J1772 Combo) | July 2026 |
| KC EV 1 LVL 3 HYUN NW 2011 Charleston Ave | ChargePoint Network | DC fast 1 DC fast · CHAdeMO, CCS (J1772 Combo) | July 2026 |
| SBLHC MOB SBLHC #1 1000 Health Center dr | ChargePoint Network | 2 Level 2 · J1772 (Level 2) | July 2026 |
| SBLHC MOB SBLHC #2 1000 Health Center dr | ChargePoint Network | 2 Level 2 · J1772 (Level 2) | July 2026 |
| LAKE LAND COLLE POWER HOUSE 5001 Lake Land Blvd | ChargePoint Network | 2 Level 2 · J1772 (Level 2) | July 2026 |
| LIFT BUILDING AC CHARGER 113 S 17th St | ChargePoint Network | 2 Level 2 · J1772 (Level 2) | July 2026 |
| Best Western - Mattoon, IL 1416 Broadway Ave | TURNONGREEN | 2 Level 2 · J1772 (Level 2) | December 2025 |
Spotted something out of date or missing? Report a correction.
What this means
Level 2 is the standard public and home charger (240V) — a few hours for a full charge, fine for shopping, work, or overnight. DC fast charging is the highway kind: 20–40 minutes to most of a charge, but not every station has it.
Connectors are the plug shape. J1772 is the universal Level 2 plug almost every non-Tesla EV uses. CCS and CHAdeMO are DC fast-charging plugs (CHAdeMO is older, mostly older Nissan Leafs). NACS is Tesla's plug, now the emerging US standard — many newer non-Teslas use it or an adapter.
This page summarizes NREL's own station records and is not a live availability map — a charger listed here can still be busy, broken, or behind a gate. Check the network's app before you rely on a specific plug.
Charging at home in Mattoon?
Most EV owners do the bulk of their charging overnight at home on a Level 2 charger. See our home EV charger buying guide for what to look for and how to match a charger to your car's connector.
EV charging near Mattoon
Source: U.S. DOE / NREL Alternative Fuels Data Center (AFDC) Station Locator, retrieved July 2026. Public stations only.