ChargingAtlas

IL / Waukegan

IL · EV charging

EV charging in Waukegan, IL

Here is what NREL's public data shows about EV charging in Waukegan, IL. As of NREL AFDC data retrieved July 2026, Waukegan has 10 public charging stations with 20 Level 2 ports, including 20 DC fast-charging ports for quick top-ups.

DC fast   Level 2   not recently confirmed  ·  click a marker for details, directions & Street View

Stations are operated across 4 networks: ChargePoint Network (6), Tesla Destination (2), Tesla (1), Blink Network (1).

Connectors on record: J1772 (Level 2) at 9 stations; NACS / Tesla at 3 stations.

3 stations carry a NACS / Tesla connector — relevant if you drive a Tesla or a newer EV that has switched to NACS.

Notable charging stations

The largest sites by port count, DC fast first. Waukegan has 10 public stations in all — see the map above.

StationNetworkChargingConfirmed
Waukegan, IL - Tesla Supercharger
4011 Fountain Square Place
Tesla DC fast 20 DC fast · NACS / Tesla June 2026
Waukegan National Airport - Tesla Destination
2601 W Plane Rest Dr
Tesla Destination 4 Level 2 · J1772 (Level 2), NACS / Tesla ⚠ July 2024
Waukegan Harbor & Marina - Tesla Destination
27 E Madison Ave
Tesla Destination 4 Level 2 · J1772 (Level 2), NACS / Tesla ⚠ July 2024
E4 Charging Solutions - Waukegan Marina
55 South Harbor Place
Blink Network 4 Level 2 · J1772 (Level 2) July 2026
EV PILOT 3010 GRAND
3010 Grand Ave
ChargePoint Network 2 Level 2 · J1772 (Level 2) July 2026
CLC LAKESHORE 1
30 N Sheridan Rd
ChargePoint Network 2 Level 2 · J1772 (Level 2) July 2026
EV PILOT FLPL 04 SR
18 N County St
ChargePoint Network 1 Level 2 · J1772 (Level 2) July 2026
EV PILOT FLPL 02 NR
18 N County St
ChargePoint Network 1 Level 2 · J1772 (Level 2) July 2026
EV PILOT FLPL 01 NL
18 N County St
ChargePoint Network 1 Level 2 · J1772 (Level 2) July 2026
EV PILOT FLPL 03 SL
18 N County St
ChargePoint Network 1 Level 2 · J1772 (Level 2) July 2026

⚠ 2 of Waukegan's 10 stations haven't been re-confirmed by NREL in over 18 months and may be out of service — confirm in the network's app. Spotted something out of date or missing? Report a correction.

What this means

Level 2 is the standard public and home charger (240V) — a few hours for a full charge, fine for shopping, work, or overnight. DC fast charging is the highway kind: 20–40 minutes to most of a charge, but not every station has it.

Connectors are the plug shape. J1772 is the universal Level 2 plug almost every non-Tesla EV uses. CCS and CHAdeMO are DC fast-charging plugs (CHAdeMO is older, mostly older Nissan Leafs). NACS is Tesla's plug, now the emerging US standard — many newer non-Teslas use it or an adapter.

This page summarizes NREL's own station records and is not a live availability map — a charger listed here can still be busy, broken, or behind a gate. Check the network's app before you rely on a specific plug.

Charging at home in Waukegan?

Most EV owners do the bulk of their charging overnight at home on a Level 2 charger. See our home EV charger buying guide for what to look for and how to match a charger to your car's connector.

EV charging near Waukegan

Source: U.S. DOE / NREL Alternative Fuels Data Center (AFDC) Station Locator, retrieved July 2026. Public stations only.