IN / Goshen
IN · EV charging
EV charging in Goshen, IN
Here is what NREL's public data shows about EV charging in Goshen, IN. As of NREL AFDC data retrieved July 2026, Goshen has 11 public charging stations with 16 Level 2 ports, including 10 DC fast-charging ports for quick top-ups.
DC fast Level 2 not recently confirmed · click a marker for details, directions & Street View
- 11Public stations
- 16Level 2 ports
- 10DC fast ports
- 38%Ports that are DC fast
Stations are operated across 2 networks: ChargePoint Network (10), Tesla (1).
Connectors on record: J1772 (Level 2) at 8 stations; NACS / Tesla at 3 stations; CCS (J1772 Combo) at 2 stations.
3 stations carry a NACS / Tesla connector — relevant if you drive a Tesla or a newer EV that has switched to NACS.
Notable charging stations
The largest sites by port count, DC fast first. Goshen has 11 public stations in all — see the map above.
| Station | Network | Charging | Confirmed |
|---|---|---|---|
| Goshen, IN - Tesla Supercharger 1001 W Pike St | Tesla | DC fast 8 DC fast · NACS / Tesla | June 2026 |
| GOSHEN SOUTH LOT 3202 Elkhart Rd | ChargePoint Network | DC fast 1 DC fast · CCS (J1772 Combo), NACS / Tesla | July 2026 |
| GOSHEN STATION 8255 3202 Elkhart Road | ChargePoint Network | DC fast 1 DC fast · CCS (J1772 Combo), NACS / Tesla | July 2026 |
| GOSHEN LIBRARY GOSHEN LIBRARY 601 S 5th St. | ChargePoint Network | 2 Level 2 · J1772 (Level 2) | July 2026 |
| CITY OF GOSHEN 128 WATER ST 128 Water St | ChargePoint Network | 2 Level 2 · J1772 (Level 2) | July 2026 |
| CITY OF GOSHEN CITY HALL-WEST 202 S 5th St | ChargePoint Network | 2 Level 2 · J1772 (Level 2) | July 2026 |
| CITY OF GOSHEN CITY HALL-EAST 202 S 5th St | ChargePoint Network | 2 Level 2 · J1772 (Level 2) | July 2026 |
| CITY OF GOSHEN RIETH CENTER 410 W Plymouth Ave | ChargePoint Network | 2 Level 2 · J1772 (Level 2) | July 2026 |
| GOSHEN COLLEGE PARKING LOT 604 College Ave | ChargePoint Network | 2 Level 2 · J1772 (Level 2) | July 2026 |
| ECCOURTHOUSE STATION 1 1905 Reliance Road | ChargePoint Network | 2 Level 2 · J1772 (Level 2) | July 2026 |
Spotted something out of date or missing? Report a correction.
What this means
Level 2 is the standard public and home charger (240V) — a few hours for a full charge, fine for shopping, work, or overnight. DC fast charging is the highway kind: 20–40 minutes to most of a charge, but not every station has it.
Connectors are the plug shape. J1772 is the universal Level 2 plug almost every non-Tesla EV uses. CCS and CHAdeMO are DC fast-charging plugs (CHAdeMO is older, mostly older Nissan Leafs). NACS is Tesla's plug, now the emerging US standard — many newer non-Teslas use it or an adapter.
This page summarizes NREL's own station records and is not a live availability map — a charger listed here can still be busy, broken, or behind a gate. Check the network's app before you rely on a specific plug.
Charging at home in Goshen?
Most EV owners do the bulk of their charging overnight at home on a Level 2 charger. See our home EV charger buying guide for what to look for and how to match a charger to your car's connector.
EV charging near Goshen
Source: U.S. DOE / NREL Alternative Fuels Data Center (AFDC) Station Locator, retrieved July 2026. Public stations only.