IN / Plymouth
IN · EV charging
EV charging in Plymouth, IN
Here is what NREL's public data shows about EV charging in Plymouth, IN. As of NREL AFDC data retrieved July 2026, Plymouth has 7 public charging stations with 11 Level 2 ports, including 2 DC fast-charging ports for quick top-ups.
DC fast Level 2 not recently confirmed · click a marker for details, directions & Street View
- 7Public stations
- 11Level 2 ports
- 2DC fast ports
- 15%Ports that are DC fast
⚡ 2 stations list free charging
Stations are operated across 3 networks: ChargePoint Network (5), Non-networked (1), Blink Network (1).
Connectors on record: J1772 (Level 2) at 6 stations; CCS (J1772 Combo) at 1 station.
Of these stations, 2 list free charging, per NREL's pricing field. Pricing is not recorded for the remaining 5. Always confirm current pricing with the network before you charge.
Notable charging stations
The largest sites by port count, DC fast first. Plymouth has 7 public stations in all — see the map above.
| Station | Network | Charging | Confirmed |
|---|---|---|---|
| OLIVER FORD DC FASTCHARGER 1001 East Jefferson Street | ChargePoint Network | DC fast 2 DC fast · CCS (J1772 Combo) | July 2026 |
| The Center at Donaldson 9601 Union Rd | Non-networked | 2 Level 2 · J1772 (Level 2) | November 2025 |
| RIVER PARK SQ RIVER PARK SQ 102 Water st | ChargePoint Network | 2 Level 2 · J1772 (Level 2) | July 2026 |
| OLIVER FORD NORTH WEST 1001 East Jefferson Street | ChargePoint Network | 2 Level 2 · J1772 (Level 2) | July 2026 |
| OLIVER FORD FRONT CHARGER 1001 East Jefferson Street | ChargePoint Network | 2 Level 2 · J1772 (Level 2) | July 2026 |
| RIVER PARK SQ NIXON FIELD 351 Becknell Dr | ChargePoint Network | 2 Level 2 · J1772 (Level 2) | July 2026 |
| Auto Park Chevrolet Buick GMC 2303 N. Oak Rd. | Blink Network | 1 Level 2 · J1772 (Level 2) | July 2026 |
Spotted something out of date or missing? Report a correction.
What this means
Level 2 is the standard public and home charger (240V) — a few hours for a full charge, fine for shopping, work, or overnight. DC fast charging is the highway kind: 20–40 minutes to most of a charge, but not every station has it.
Connectors are the plug shape. J1772 is the universal Level 2 plug almost every non-Tesla EV uses. CCS and CHAdeMO are DC fast-charging plugs (CHAdeMO is older, mostly older Nissan Leafs). NACS is Tesla's plug, now the emerging US standard — many newer non-Teslas use it or an adapter.
This page summarizes NREL's own station records and is not a live availability map — a charger listed here can still be busy, broken, or behind a gate. Check the network's app before you rely on a specific plug.
Charging at home in Plymouth?
Most EV owners do the bulk of their charging overnight at home on a Level 2 charger. See our home EV charger buying guide for what to look for and how to match a charger to your car's connector.
EV charging near Plymouth
Source: U.S. DOE / NREL Alternative Fuels Data Center (AFDC) Station Locator, retrieved July 2026. Public stations only.