MA / Attleboro
MA · EV charging
EV charging in Attleboro, MA
Here is what NREL's public data shows about EV charging in Attleboro, MA. As of NREL AFDC data retrieved July 2026, Attleboro has 15 public charging stations with 43 Level 2 ports, all Level 2 (no DC fast charging on record).
DC fast Level 2 not recently confirmed · click a marker for details, directions & Street View
- 15Public stations
- 43Level 2 ports
- 0DC fast ports
- 0%Ports that are DC fast
Stations are operated across 3 networks: ChargePoint Network (13), Non-networked (1), FLO (1).
Connectors on record: J1772 (Level 2) at 15 stations.
Notable charging stations
The largest sites by port count, DC fast first. Attleboro has 15 public stations in all — see the map above.
| Station | Network | Charging | Confirmed |
|---|---|---|---|
| Attleboro High School 100 Rathbun Willard Dr | Non-networked | 16 Level 2 · J1772 (Level 2) | ⚠ May 2024 |
| SUPPLYNE COUNTER DOOR 2 123A East St | ChargePoint Network | 2 Level 2 · J1772 (Level 2) | July 2026 |
| SUPPLYNE COUNTER DOOR 1 123A East St | ChargePoint Network | 2 Level 2 · J1772 (Level 2) | July 2026 |
| ATTLEBORO ATTLEBORO 3 527 Pleasant St | ChargePoint Network | 2 Level 2 · J1772 (Level 2) | July 2026 |
| ATTLEBORO ATTLEBORO 2 527 Pleasant St | ChargePoint Network | 2 Level 2 · J1772 (Level 2) | July 2026 |
| Government Center, 75 Park Street 75 Park Street | FLO | 2 Level 2 · J1772 (Level 2) | July 2026 |
| ATTLEBOROHS AHS5 100 Rathbun Willard Drive | ChargePoint Network | 2 Level 2 · J1772 (Level 2) | July 2026 |
| ATTLEBOROHS AHS4 100 Rathbun Willard Drive | ChargePoint Network | 2 Level 2 · J1772 (Level 2) | July 2026 |
| ATTLEBOROHS AHS7 100 Rathbun Willard Drive | ChargePoint Network | 2 Level 2 · J1772 (Level 2) | July 2026 |
| ATTLEBOROHS AHS6 100 Rathbun Willard Drive | ChargePoint Network | 2 Level 2 · J1772 (Level 2) | July 2026 |
⚠ 1 of Attleboro's 15 stations haven't been re-confirmed by NREL in over 18 months and may be out of service — confirm in the network's app. Spotted something out of date or missing? Report a correction.
What this means
Level 2 is the standard public and home charger (240V) — a few hours for a full charge, fine for shopping, work, or overnight. DC fast charging is the highway kind: 20–40 minutes to most of a charge, but not every station has it.
Connectors are the plug shape. J1772 is the universal Level 2 plug almost every non-Tesla EV uses. CCS and CHAdeMO are DC fast-charging plugs (CHAdeMO is older, mostly older Nissan Leafs). NACS is Tesla's plug, now the emerging US standard — many newer non-Teslas use it or an adapter.
This page summarizes NREL's own station records and is not a live availability map — a charger listed here can still be busy, broken, or behind a gate. Check the network's app before you rely on a specific plug.
Charging at home in Attleboro?
Most EV owners do the bulk of their charging overnight at home on a Level 2 charger. See our home EV charger buying guide for what to look for and how to match a charger to your car's connector.
EV charging near Attleboro
Source: U.S. DOE / NREL Alternative Fuels Data Center (AFDC) Station Locator, retrieved July 2026. Public stations only.