Here is what NREL's public data shows about EV charging in Norton, MA. As of NREL AFDC data retrieved July 2026, Norton has 12 public charging stations with 45 Level 2 ports, including 12 DC fast-charging ports for quick top-ups.
DC fast Level 2 not recently confirmed · click a marker for details, directions & Street View
- 12Public stations
- 45Level 2 ports
- 12DC fast ports
- 21%Ports that are DC fast
Stations are operated across 4 networks: ChargePoint Network (7), AMPUP (2), RED_E (2), LOOP (1).
Connectors on record: J1772 (Level 2) at 10 stations; CCS (J1772 Combo) at 2 stations.
Of these stations, 1 are paid, per NREL's pricing field. Pricing is not recorded for the remaining 11. Always confirm current pricing with the network before you charge.
Notable charging stations
The largest sites by port count, DC fast first. Norton has 12 public stations in all — see the map above.
| Station | Network | Charging | Confirmed |
|---|---|---|---|
| Kellys Place 294 East Main St | RED_E | DC fast 6 DC fast · CCS (J1772 Combo) | July 2026 |
| BES Realty 41 Pleasant | RED_E | DC fast 6 DC fast · CCS (J1772 Combo) | July 2026 |
| Wheaton Lot 1 - College Green 26 E Main St | AMPUP | 14 Level 2 · J1772 (Level 2) | ⚠ October 2022 |
| Wheaton College Lot 2 - Elm St E Main St | AMPUP | 14 Level 2 · J1772 (Level 2) | ⚠ November 2022 |
| Norton 42 Leonard St | LOOP | 3 Level 2 · J1772 (Level 2) | July 2026 |
| NORTON PUBLIC L EVA1 68 E Main St | ChargePoint Network | 2 Level 2 · J1772 (Level 2) | July 2026 |
| NORTON PUBLIC L EV2 68 E Main St | ChargePoint Network | 2 Level 2 · J1772 (Level 2) | July 2026 |
| BLUESTAR 19 LEONARD 19 Leonard St | ChargePoint Network | 2 Level 2 · J1772 (Level 2) | July 2026 |
| BLUESTAR 15 LEONARD 15 Leonard St | ChargePoint Network | 2 Level 2 · J1772 (Level 2) | July 2026 |
| NORTON TOWN TOWN HALL #1 72 East Main Street | ChargePoint Network | 2 Level 2 · J1772 (Level 2) | July 2026 |
⚠ 2 of Norton's 12 stations haven't been re-confirmed by NREL in over 18 months and may be out of service — confirm in the network's app. Spotted something out of date or missing? Report a correction.
What this means
Level 2 is the standard public and home charger (240V) — a few hours for a full charge, fine for shopping, work, or overnight. DC fast charging is the highway kind: 20–40 minutes to most of a charge, but not every station has it.
Connectors are the plug shape. J1772 is the universal Level 2 plug almost every non-Tesla EV uses. CCS and CHAdeMO are DC fast-charging plugs (CHAdeMO is older, mostly older Nissan Leafs). NACS is Tesla's plug, now the emerging US standard — many newer non-Teslas use it or an adapter.
This page summarizes NREL's own station records and is not a live availability map — a charger listed here can still be busy, broken, or behind a gate. Check the network's app before you rely on a specific plug.
Charging at home in Norton?
Most EV owners do the bulk of their charging overnight at home on a Level 2 charger. See our home EV charger buying guide for what to look for and how to match a charger to your car's connector.
EV charging near Norton
Source: U.S. DOE / NREL Alternative Fuels Data Center (AFDC) Station Locator, retrieved July 2026. Public stations only.