MI / Allen Park
MI · EV charging
EV charging in Allen Park, MI
Here is what NREL's public data shows about EV charging in Allen Park, MI. As of NREL AFDC data retrieved September 2026, Allen Park has 7 public charging stations with 11 Level 2 ports, including 8 DC fast-charging ports for quick top-ups.
DC fast Level 2 not recently confirmed · click a marker for details, directions & Street View
- 7Public stations
- 11Level 2 ports
- 8DC fast ports
- 42%Ports that are DC fast
Stations are operated across 4 networks: RED_E (2), FORD_CHARGE (2), ChargePoint Network (2), Blink Network (1).
Connectors on record: J1772 (Level 2) at 5 stations; NACS / Tesla at 4 stations; CCS (J1772 Combo) at 2 stations.
Of these stations, 1 are paid, per NREL's pricing field. Pricing is not recorded for the remaining 6. Always confirm current pricing with the network before you charge.
4 stations carry a NACS / Tesla connector — relevant if you drive a Tesla or a newer EV that has switched to NACS.
Notable charging stations
The largest sites by port count, DC fast first. Allen Park has 7 public stations in all — see the map above.
| Station | Network | Charging | Confirmed |
|---|---|---|---|
| Ford Vehicle Performance + Electrification Center 8500 Enterprise Dr | FORD_CHARGE | DC fast 4 DC fast · CCS (J1772 Combo), NACS / Tesla | September 2026 |
| Ford Vehicle Performance and Electrification Center - Inside Garage 8500 Enterprise Dr | FORD_CHARGE | DC fast 4 DC fast · CCS (J1772 Combo), NACS / Tesla | September 2026 |
| Best Western Allen Park 3000 Enterprise Dr | RED_E | 4 Level 2 · J1772 (Level 2) | September 2026 |
| Voran Funeral Home AP 5850 Allen Rd | RED_E | 2 Level 2 · J1772 (Level 2) | September 2026 |
| MEIJER STORES MEIJER 233 ST2 3565 Fairlane Drive | ChargePoint Network | 2 Level 2 · J1772 (Level 2), NACS / Tesla | September 2026 |
| MEIJER STORES MEIJER 233 ST1 3565 Fairlane Drive | ChargePoint Network | 2 Level 2 · J1772 (Level 2), NACS / Tesla | September 2026 |
| Critter Pet Shop 19309 Ecorse | Blink Network | 1 Level 2 · J1772 (Level 2) | September 2026 |
Spotted something out of date or missing? Report a correction.
What this means
Level 2 is the standard public and home charger (240V) — a few hours for a full charge, fine for shopping, work, or overnight. DC fast charging is the highway kind: 20–40 minutes to most of a charge, but not every station has it.
Connectors are the plug shape. J1772 is the universal Level 2 plug almost every non-Tesla EV uses. CCS and CHAdeMO are DC fast-charging plugs (CHAdeMO is older, mostly older Nissan Leafs). NACS is Tesla's plug, now the emerging US standard — many newer non-Teslas use it or an adapter.
This page summarizes NREL's own station records and is not a live availability map — a charger listed here can still be busy, broken, or behind a gate. Check the network's app before you rely on a specific plug.
Charging at home in Allen Park?
Most EV owners do the bulk of their charging overnight at home on a Level 2 charger. See our home EV charger buying guide for what to look for and how to match a charger to your car's connector.
EV charging near Allen Park
Source: U.S. DOE / NREL Alternative Fuels Data Center (AFDC) Station Locator, retrieved September 2026. Public stations only.