MI / Clinton Township
MI · EV charging
EV charging in Clinton Township, MI
Here is what NREL's public data shows about EV charging in Clinton Township, MI. As of NREL AFDC data retrieved July 2026, Clinton Township has 11 public charging stations with 23 Level 2 ports, including 13 DC fast-charging ports for quick top-ups.
DC fast Level 2 not recently confirmed · click a marker for details, directions & Street View
- 11Public stations
- 23Level 2 ports
- 13DC fast ports
- 36%Ports that are DC fast
Stations are operated across 4 networks: ChargePoint Network (6), FLO (3), EV Connect (1), RED_E (1).
Connectors on record: J1772 (Level 2) at 10 stations; CCS (J1772 Combo) at 2 stations; NACS / Tesla at 1 station.
1 station carries a NACS / Tesla connector — relevant if you drive a Tesla or a newer EV that has switched to NACS.
Notable charging stations
The largest sites by port count, DC fast first. Clinton Township has 11 public stations in all — see the map above.
| Station | Network | Charging | Confirmed |
|---|---|---|---|
| Moran Chevrolet Clinton Township 35500 South Gratiot Ave | EV Connect | DC fast 9 DC fast + 1 Level 2 · J1772 (Level 2), CCS (J1772 Combo) | July 2026 |
| FasCharge 8245 Clinton Township 35700 Harper Ave | RED_E | DC fast 4 DC fast · CCS (J1772 Combo), NACS / Tesla | July 2026 |
| Macomb Community College (Center Campus, Lot 11, N/R bldgs.) 44575 Garfield Road | FLO | 4 Level 2 · J1772 (Level 2) | July 2026 |
| Macomb Community College (Center Campus, Lot 4, near Cultural Ctr,) 44575 Garfield Road | FLO | 4 Level 2 · J1772 (Level 2) | July 2026 |
| HFHS MACOMB NT LOT1A 15855 19 Mile Rd | ChargePoint Network | 2 Level 2 · J1772 (Level 2) | July 2026 |
| HFHS MACOMB NT LOT1B 15855 19 Mile Rd | ChargePoint Network | 2 Level 2 · J1772 (Level 2) | July 2026 |
| HFHS MACOMB NT LOT1C 15855 19 Mile Rd | ChargePoint Network | 2 Level 2 · J1772 (Level 2) | July 2026 |
| MACOMB COLLEGE BUILDING J LT6 44575 Garfield Road | ChargePoint Network | 2 Level 2 · J1772 (Level 2) | July 2026 |
| MACOMB COLLEGE EAST CAMPUS 1 21901 Dunham Rd | ChargePoint Network | 2 Level 2 · J1772 (Level 2) | July 2026 |
| MACOMB COLLEGE EAST CAMPUS 2 21901 Dunham Rd | ChargePoint Network | 2 Level 2 · J1772 (Level 2) | July 2026 |
Spotted something out of date or missing? Report a correction.
What this means
Level 2 is the standard public and home charger (240V) — a few hours for a full charge, fine for shopping, work, or overnight. DC fast charging is the highway kind: 20–40 minutes to most of a charge, but not every station has it.
Connectors are the plug shape. J1772 is the universal Level 2 plug almost every non-Tesla EV uses. CCS and CHAdeMO are DC fast-charging plugs (CHAdeMO is older, mostly older Nissan Leafs). NACS is Tesla's plug, now the emerging US standard — many newer non-Teslas use it or an adapter.
This page summarizes NREL's own station records and is not a live availability map — a charger listed here can still be busy, broken, or behind a gate. Check the network's app before you rely on a specific plug.
Charging at home in Clinton Township?
Most EV owners do the bulk of their charging overnight at home on a Level 2 charger. See our home EV charger buying guide for what to look for and how to match a charger to your car's connector.
EV charging near Clinton Township
Source: U.S. DOE / NREL Alternative Fuels Data Center (AFDC) Station Locator, retrieved July 2026. Public stations only.