ChargingAtlas

MI / Sterling Heights

MI · EV charging

EV charging in Sterling Heights, MI

Here is what NREL's public data shows about EV charging in Sterling Heights, MI. As of NREL AFDC data retrieved July 2026, Sterling Heights has 15 public charging stations with 26 Level 2 ports, including 4 DC fast-charging ports for quick top-ups.

DC fast   Level 2   not recently confirmed  ·  click a marker for details, directions & Street View

⚡ 2 stations list free charging

Stations are operated across 5 networks: ChargePoint Network (9), Non-networked (2), EVGATEWAY (2), ZEFNET (1), and 1 more.

Connectors on record: J1772 (Level 2) at 14 stations; CCS (J1772 Combo) at 1 station; NACS / Tesla at 1 station.

Of these stations, 2 list free charging, per NREL's pricing field. Pricing is not recorded for the remaining 13. Always confirm current pricing with the network before you charge.

1 station carries a NACS / Tesla connector — relevant if you drive a Tesla or a newer EV that has switched to NACS.

Notable charging stations

The largest sites by port count, DC fast first. Sterling Heights has 15 public stations in all — see the map above.

StationNetworkChargingConfirmed
Fast Napa Sterling Heights
35050
EVGATEWAY DC fast 4 DC fast · CCS (J1772 Combo), NACS / Tesla July 2026
Suburban Ford - Sterling Heights
40333 Van Dyke Ave
Non-networked 4 Level 2 · J1772 (Level 2) July 2025
Sterling Heights Community Center
40250 Dodge Park Rd
Non-networked 2 Level 2 · J1772 (Level 2) May 2025
SM SUNSHINE SH
13630 Hall Rd
ChargePoint Network 2 Level 2 · J1772 (Level 2) July 2026
L419 CP6K1
40331 Van Dyke Ave
ChargePoint Network 2 Level 2 · J1772 (Level 2) July 2026
L419 CP6K-3
40331 Van Dyke Ave
ChargePoint Network 2 Level 2 · J1772 (Level 2) July 2026
L419 CP6K-2
40331 Van Dyke Ave
ChargePoint Network 2 Level 2 · J1772 (Level 2) July 2026
Sterling Heights Community Center
40250 Dodge Park Road
ZEFNET 2 Level 2 · J1772 (Level 2) July 2026
Destination Napa Sterling Heights
35030 Mound Rd
EVGATEWAY 2 Level 2 · J1772 (Level 2) July 2026
POLICE DEPARTME PD
40333 Dodge Park Road
ChargePoint Network 2 Level 2 · J1772 (Level 2) July 2026

Spotted something out of date or missing? Report a correction.

What this means

Level 2 is the standard public and home charger (240V) — a few hours for a full charge, fine for shopping, work, or overnight. DC fast charging is the highway kind: 20–40 minutes to most of a charge, but not every station has it.

Connectors are the plug shape. J1772 is the universal Level 2 plug almost every non-Tesla EV uses. CCS and CHAdeMO are DC fast-charging plugs (CHAdeMO is older, mostly older Nissan Leafs). NACS is Tesla's plug, now the emerging US standard — many newer non-Teslas use it or an adapter.

This page summarizes NREL's own station records and is not a live availability map — a charger listed here can still be busy, broken, or behind a gate. Check the network's app before you rely on a specific plug.

Charging at home in Sterling Heights?

Most EV owners do the bulk of their charging overnight at home on a Level 2 charger. See our home EV charger buying guide for what to look for and how to match a charger to your car's connector.

EV charging near Sterling Heights

Source: U.S. DOE / NREL Alternative Fuels Data Center (AFDC) Station Locator, retrieved July 2026. Public stations only.