NJ / Roselle
NJ · EV charging
EV charging in Roselle, NJ
Here is what NREL's public data shows about EV charging in Roselle, NJ. As of NREL AFDC data retrieved November 2026, Roselle has 4 public charging stations with 5 Level 2 ports, all Level 2 (no DC fast charging on record).
DC fast Level 2 not recently confirmed · click a marker for details, directions & Street View
- 4Public stations
- 5Level 2 ports
- 0DC fast ports
- 0%Ports that are DC fast
Stations are operated across 1 network: ChargePoint Network (4).
Connectors on record: J1772 (Level 2) at 4 stations; NACS / Tesla at 1 station.
1 station carries a NACS / Tesla connector — relevant if you drive a Tesla or a newer EV that has switched to NACS.
How Roselle compares
- 1.7 public stations per 10,000 residents — 74% of the New Jersey rate (2.3).
- 0 DC fast ports per 10,000 residents (New Jersey: 2.3).
Last verified: NREL confirmed 100% of Roselle's stations in the 12 months before this snapshot, most recently in November 2026.
Population: U.S. Census Bureau, Vintage 2024 population estimates (23,064 residents; New Jersey 9,500,851). Station counts use NREL's address city, which can extend past city limits, so rates are approximate.
Notable charging stations
The largest sites by port count, DC fast first. Roselle has 4 public stations in all — see the map above.
| Station | Network | Charging | Confirmed |
|---|---|---|---|
| AHOWFC AHOW EV 01 239 East 1st Avenue | ChargePoint Network | 2 Level 2 · J1772 (Level 2) | November 2026 |
| THE PARK 2300 PARKVIEW-1 2410 Parkview Dr | ChargePoint Network | 1 Level 2 · J1772 (Level 2) | November 2026 |
| THE PARK 2300 PARKVIEW-2 2410 Parkview Dr | ChargePoint Network | 1 Level 2 · J1772 (Level 2) | November 2026 |
| AHOWFC AHOW EV 02 259 E 1st Ave | ChargePoint Network | 1 Level 2 · J1772 (Level 2), NACS / Tesla | November 2026 |
Spotted something out of date or missing? Report a correction.
What this means
Level 2 is the standard public and home charger (240V) — a few hours for a full charge, fine for shopping, work, or overnight. DC fast charging is the highway kind: 20–40 minutes to most of a charge, but not every station has it.
Connectors are the plug shape. J1772 is the universal Level 2 plug almost every non-Tesla EV uses. CCS and CHAdeMO are DC fast-charging plugs (CHAdeMO is older, mostly older Nissan Leafs). NACS is Tesla's plug, now the emerging US standard — many newer non-Teslas use it or an adapter.
This page summarizes NREL's own station records and is not a live availability map — a charger listed here can still be busy, broken, or behind a gate. Check the network's app before you rely on a specific plug.
Charging at home in Roselle?
Most EV owners do the bulk of their charging overnight at home on a Level 2 charger. See our home EV charger buying guide for what to look for and how to match a charger to your car's connector.
EV charging near Roselle
Source: U.S. DOE / NREL Alternative Fuels Data Center (AFDC) Station Locator, retrieved November 2026. Public stations only.