NJ / Stafford Township
NJ · EV charging
EV charging in Stafford Township, NJ
Here is what NREL's public data shows about EV charging in Stafford Township, NJ. As of NREL AFDC data retrieved July 2026, Stafford Township has 12 public charging stations with 9 Level 2 ports, including 19 DC fast-charging ports for quick top-ups.
DC fast Level 2 not recently confirmed · click a marker for details, directions & Street View
- 12Public stations
- 9Level 2 ports
- 19DC fast ports
- 68%Ports that are DC fast
Stations are operated across 3 networks: ChargePoint Network (10), Tesla (1), CHARGESMART_EV (1).
Connectors on record: J1772 (Level 2) at 7 stations; CCS (J1772 Combo) at 4 stations; CHAdeMO at 2 stations; NACS / Tesla at 1 station.
1 station carries a NACS / Tesla connector — relevant if you drive a Tesla or a newer EV that has switched to NACS.
Notable charging stations
The largest sites by port count, DC fast first. Stafford Township has 12 public stations in all — see the map above.
| Station | Network | Charging | Confirmed |
|---|---|---|---|
| Manahawkin, NJ - Tesla Supercharger 209 Stafford Park Blvd | Tesla | DC fast 12 DC fast · NACS / Tesla | June 2026 |
| Causeway Ford 375 NJ-72 | CHARGESMART_EV | DC fast 4 DC fast · CCS (J1772 Combo) | July 2026 |
| HYUNDAI DELIVER CHARGER 3 405 NJ-72 | ChargePoint Network | DC fast 1 DC fast · CHAdeMO, CCS (J1772 Combo) | July 2026 |
| MANAHAWKIN KIA MKIA 270 New Jersey 72 | ChargePoint Network | DC fast 1 DC fast · CCS (J1772 Combo) | July 2026 |
| HYUNDAI DELIVER FRONT LOT 405 NJ-72 | ChargePoint Network | DC fast 1 DC fast · CHAdeMO, CCS (J1772 Combo) | July 2026 |
| MANAHAWKIN CDJR SERVICE PARKING 188 New Jersey 72 | ChargePoint Network | 2 Level 2 · J1772 (Level 2) | July 2026 |
| MANAHAWKIN CDJR SERVICE DRIVE 188 NJ-72 | ChargePoint Network | 2 Level 2 · J1772 (Level 2) | July 2026 |
| STAFFORD OCEAN LIB ST5 179 South Main Street | ChargePoint Network | 1 Level 2 · J1772 (Level 2) | July 2026 |
| STAFFORD OCEAN LIB ST4 179 South Main Street | ChargePoint Network | 1 Level 2 · J1772 (Level 2) | July 2026 |
| STAFFORD OCEAN LIB ST3 179 South Main Street | ChargePoint Network | 1 Level 2 · J1772 (Level 2) | July 2026 |
Spotted something out of date or missing? Report a correction.
What this means
Level 2 is the standard public and home charger (240V) — a few hours for a full charge, fine for shopping, work, or overnight. DC fast charging is the highway kind: 20–40 minutes to most of a charge, but not every station has it.
Connectors are the plug shape. J1772 is the universal Level 2 plug almost every non-Tesla EV uses. CCS and CHAdeMO are DC fast-charging plugs (CHAdeMO is older, mostly older Nissan Leafs). NACS is Tesla's plug, now the emerging US standard — many newer non-Teslas use it or an adapter.
This page summarizes NREL's own station records and is not a live availability map — a charger listed here can still be busy, broken, or behind a gate. Check the network's app before you rely on a specific plug.
Charging at home in Stafford Township?
Most EV owners do the bulk of their charging overnight at home on a Level 2 charger. See our home EV charger buying guide for what to look for and how to match a charger to your car's connector.
EV charging near Stafford Township
Source: U.S. DOE / NREL Alternative Fuels Data Center (AFDC) Station Locator, retrieved July 2026. Public stations only.