ChargingAtlas

NY / Clifton Park

NY · EV charging

EV charging in Clifton Park, NY

Here is what NREL's public data shows about EV charging in Clifton Park, NY. As of NREL AFDC data retrieved July 2026, Clifton Park has 47 public charging stations with 212 Level 2 ports, including 30 DC fast-charging ports for quick top-ups.

DC fast   Level 2   not recently confirmed  ·  click a marker for details, directions & Street View

⚡ 3 stations list free charging

Stations are operated across 9 networks: ChargePoint Network (19), VIALYNK (9), QUICKCHARGE (9), Non-networked (3), and 5 more.

Connectors on record: J1772 (Level 2) at 44 stations; CCS (J1772 Combo) at 3 stations; NACS / Tesla at 1 station.

Of these stations, 3 list free charging, per NREL's pricing field. Pricing is not recorded for the remaining 44. Always confirm current pricing with the network before you charge.

1 station carries a NACS / Tesla connector — relevant if you drive a Tesla or a newer EV that has switched to NACS.

Notable charging stations

The largest sites by port count, DC fast first. Clifton Park has 47 public stations in all — see the map above.

StationNetworkChargingConfirmed
Clifton Park, NY - Tesla Supercharger
22 Clifton Country Rd
Tesla DC fast 24 DC fast · CCS (J1772 Combo), NACS / Tesla June 2026
HondoGo - Halfmoon, NY
1707 US-9
EVGATEWAY DC fast 4 DC fast · CCS (J1772 Combo) July 2026
American Star Petro - 1019 Route 146, Clifton Park
1019 New York 146
QUICKCHARGE DC fast 2 DC fast · CCS (J1772 Combo) ⚠ unknown
Van Patten Golf Club
924 Main St
VIALYNK 50 Level 2 · J1772 (Level 2) July 2026
Chargesmart Decommissioned Sites
5 Southside Dr Suite 11-184
Non-networked 14 Level 2 · J1772 (Level 2) ⚠ May 2024
Clifton Park Center
22 Clifton Country Rd
QUICKCHARGE 10 Level 2 · J1772 (Level 2) ⚠ unknown
EXEControl
9 Corporate Dr
CHARGESMART_EV 8 Level 2 · J1772 (Level 2) July 2026
Park Manor Hotel
7 Northside Dr
CHARGESMART_EV 8 Level 2 · J1772 (Level 2) July 2026
Homewood Inn & Suites Clifton Park
42 Clifton Country Rd
QUICKCHARGE 8 Level 2 · J1772 (Level 2) ⚠ unknown
Holiday Inn Express & Suites Clifton Park
18 Old Route 9
VIALYNK 6 Level 2 · J1772 (Level 2) July 2026

⚠ 14 of Clifton Park's 47 stations haven't been re-confirmed by NREL in over 18 months and may be out of service — confirm in the network's app. Spotted something out of date or missing? Report a correction.

What this means

Level 2 is the standard public and home charger (240V) — a few hours for a full charge, fine for shopping, work, or overnight. DC fast charging is the highway kind: 20–40 minutes to most of a charge, but not every station has it.

Connectors are the plug shape. J1772 is the universal Level 2 plug almost every non-Tesla EV uses. CCS and CHAdeMO are DC fast-charging plugs (CHAdeMO is older, mostly older Nissan Leafs). NACS is Tesla's plug, now the emerging US standard — many newer non-Teslas use it or an adapter.

This page summarizes NREL's own station records and is not a live availability map — a charger listed here can still be busy, broken, or behind a gate. Check the network's app before you rely on a specific plug.

Charging at home in Clifton Park?

Most EV owners do the bulk of their charging overnight at home on a Level 2 charger. See our home EV charger buying guide for what to look for and how to match a charger to your car's connector.

EV charging near Clifton Park

Source: U.S. DOE / NREL Alternative Fuels Data Center (AFDC) Station Locator, retrieved July 2026. Public stations only.