NY / Niskayuna
NY · EV charging
EV charging in Niskayuna, NY
Here is what NREL's public data shows about EV charging in Niskayuna, NY. As of NREL AFDC data retrieved July 2026, Niskayuna has 13 public charging stations with 114 Level 2 ports, all Level 2 (no DC fast charging on record).
DC fast Level 2 not recently confirmed · click a marker for details, directions & Street View
- 13Public stations
- 114Level 2 ports
- 0DC fast ports
- 0%Ports that are DC fast
⚡ 4 stations list free charging
Stations are operated across 3 networks: VIALYNK (8), Blink Network (4), FLO (1).
Connectors on record: J1772 (Level 2) at 13 stations.
Of these stations, 4 list free charging, per NREL's pricing field. Pricing is not recorded for the remaining 9. Always confirm current pricing with the network before you charge.
Notable charging stations
The largest sites by port count, DC fast first. Niskayuna has 13 public stations in all — see the map above.
| Station | Network | Charging | Confirmed |
|---|---|---|---|
| Niskayuna Gardens 1187 Hillside Ave | VIALYNK | 20 Level 2 · J1772 (Level 2) | July 2026 |
| CEB Bldg 1 ResearchCircle | Blink Network | 13 Level 2 · J1772 (Level 2) | July 2026 |
| Spin Test Facility 1 Research Cir. | Blink Network | 12 Level 2 · J1772 (Level 2) | July 2026 |
| Environment One Corp 2773 Balltown Rd | VIALYNK | 12 Level 2 · J1772 (Level 2) | July 2026 |
| Elm Ave 1 Research Circle | Blink Network | 10 Level 2 · J1772 (Level 2) | July 2026 |
| Van Antwerp Village 1365 Van Antwerp Village | VIALYNK | 10 Level 2 · J1772 (Level 2) | July 2026 |
| Momentive Performance Materials Inc. 2750 Balltown Rd | VIALYNK | 10 Level 2 · J1772 (Level 2) | July 2026 |
| Hatchet Hardware of Niskayuna 1448 Balltown Road | FLO | 6 Level 2 · J1772 (Level 2) | July 2026 |
| EP Building 1 Research Cir | Blink Network | 5 Level 2 · J1772 (Level 2) | July 2026 |
| Jeff Blatnik Park 2555 River Rd | VIALYNK | 4 Level 2 · J1772 (Level 2) | July 2026 |
Spotted something out of date or missing? Report a correction.
What this means
Level 2 is the standard public and home charger (240V) — a few hours for a full charge, fine for shopping, work, or overnight. DC fast charging is the highway kind: 20–40 minutes to most of a charge, but not every station has it.
Connectors are the plug shape. J1772 is the universal Level 2 plug almost every non-Tesla EV uses. CCS and CHAdeMO are DC fast-charging plugs (CHAdeMO is older, mostly older Nissan Leafs). NACS is Tesla's plug, now the emerging US standard — many newer non-Teslas use it or an adapter.
This page summarizes NREL's own station records and is not a live availability map — a charger listed here can still be busy, broken, or behind a gate. Check the network's app before you rely on a specific plug.
Charging at home in Niskayuna?
Most EV owners do the bulk of their charging overnight at home on a Level 2 charger. See our home EV charger buying guide for what to look for and how to match a charger to your car's connector.
EV charging near Niskayuna
Source: U.S. DOE / NREL Alternative Fuels Data Center (AFDC) Station Locator, retrieved July 2026. Public stations only.