OR / Ashland
OR · EV charging
EV charging in Ashland, OR
Here is what NREL's public data shows about EV charging in Ashland, OR. As of NREL AFDC data retrieved July 2026, Ashland has 32 public charging stations with 70 Level 2 ports, including 37 DC fast-charging ports for quick top-ups.
DC fast Level 2 not recently confirmed · click a marker for details, directions & Street View
- 32Public stations
- 70Level 2 ports
- 37DC fast ports
- 35%Ports that are DC fast
⚡ 9 stations list free charging
Stations are operated across 8 networks: ChargePoint Network (13), Non-networked (7), Tesla Destination (5), AMPUP (3), and 4 more.
Connectors on record: J1772 (Level 2) at 22 stations; NACS / Tesla at 7 stations; CCS (J1772 Combo) at 6 stations; CHAdeMO at 4 stations; NEMA 5-20 (Level 1) at 1 station.
Of these stations, 9 list free charging and 1 are paid, per NREL's pricing field. Pricing is not recorded for the remaining 22. Always confirm current pricing with the network before you charge.
7 stations carry a NACS / Tesla connector — relevant if you drive a Tesla or a newer EV that has switched to NACS.
Notable charging stations
The largest sites by port count, DC fast first. Ashland has 32 public stations in all — see the map above.
| Station | Network | Charging | Confirmed |
|---|---|---|---|
| Ashland, OR - Tesla Supercharger 580 Clover Ln | Tesla | DC fast 24 DC fast · NACS / Tesla | June 2026 |
| Ashland, OR Rechargery Relay - S Valley View Rd 461 S Valley View Rd | IONNA | DC fast 8 DC fast · CCS (J1772 Combo), NACS / Tesla | July 2026 |
| WCEH Ashland 2373 Ashland St | EVCS | DC fast 1 DC fast + 1 Level 2 · CHAdeMO, J1772 (Level 2), CCS (J1772 Combo) | July 2026 |
| TC Chevrolet 2045 OR-99 | Non-networked | DC fast 1 DC fast · CCS (J1772 Combo) | June 2025 |
| BUTLER AUTO FORD L3 1977 Oregon 99 | ChargePoint Network | DC fast 1 DC fast · CHAdeMO, CCS (J1772 Combo) | July 2026 |
| BUTLER AUTO FORD SALES LOT 1977 Oregon 99 | ChargePoint Network | DC fast 1 DC fast · CHAdeMO, CCS (J1772 Combo) | July 2026 |
| BUTLER AUTO ACURA SALES PDI 1977 Oregon 99 | ChargePoint Network | DC fast 1 DC fast · CHAdeMO, CCS (J1772 Combo) | July 2026 |
| City of Ashland - Public Parking Lot 165 Lithia Way | Non-networked | 10 Level 2 · J1772 (Level 2) | May 2025 |
| Ashland Hills Hotel 2525 Ashland Avenue | Blink Network | 8 Level 2 · J1772 (Level 2) | July 2026 |
| Southern Oregon University - Lot 8 481 Stadium St | Non-networked | 6 Level 2 · J1772 (Level 2), NEMA 5-20 (Level 1) | December 2025 |
⚠ 6 of Ashland's 32 stations haven't been re-confirmed by NREL in over 18 months and may be out of service — confirm in the network's app. Spotted something out of date or missing? Report a correction.
What this means
Level 2 is the standard public and home charger (240V) — a few hours for a full charge, fine for shopping, work, or overnight. DC fast charging is the highway kind: 20–40 minutes to most of a charge, but not every station has it.
Connectors are the plug shape. J1772 is the universal Level 2 plug almost every non-Tesla EV uses. CCS and CHAdeMO are DC fast-charging plugs (CHAdeMO is older, mostly older Nissan Leafs). NACS is Tesla's plug, now the emerging US standard — many newer non-Teslas use it or an adapter.
This page summarizes NREL's own station records and is not a live availability map — a charger listed here can still be busy, broken, or behind a gate. Check the network's app before you rely on a specific plug.
Charging at home in Ashland?
Most EV owners do the bulk of their charging overnight at home on a Level 2 charger. See our home EV charger buying guide for what to look for and how to match a charger to your car's connector.
EV charging near Ashland
Source: U.S. DOE / NREL Alternative Fuels Data Center (AFDC) Station Locator, retrieved July 2026. Public stations only.