TX / Burleson
TX · EV charging
EV charging in Burleson, TX
Here is what NREL's public data shows about EV charging in Burleson, TX. As of NREL AFDC data retrieved July 2026, Burleson has 11 public charging stations with 14 Level 2 ports, including 15 DC fast-charging ports for quick top-ups.
DC fast Level 2 not recently confirmed · click a marker for details, directions & Street View
- 11Public stations
- 14Level 2 ports
- 15DC fast ports
- 52%Ports that are DC fast
⚡ 2 stations list free charging
Stations are operated across 5 networks: ChargePoint Network (7), IN_CHARGE (1), eVgo Network (1), Tesla (1), and 1 more.
Connectors on record: J1772 (Level 2) at 8 stations; CCS (J1772 Combo) at 3 stations; CHAdeMO at 2 stations; NACS / Tesla at 1 station.
Of these stations, 2 list free charging, per NREL's pricing field. Pricing is not recorded for the remaining 9. Always confirm current pricing with the network before you charge.
1 station carries a NACS / Tesla connector — relevant if you drive a Tesla or a newer EV that has switched to NACS.
Notable charging stations
The largest sites by port count, DC fast first. Burleson has 11 public stations in all — see the map above.
| Station | Network | Charging | Confirmed |
|---|---|---|---|
| Burleson, TX - Tesla Supercharger 12369 South Fwy | Tesla | DC fast 12 DC fast · NACS / Tesla | June 2026 |
| Cracker Barrel 13301 South Fwy | eVgo Network | DC fast 1 DC fast + 1 Level 2 · CHAdeMO, J1772 (Level 2), CCS (J1772 Combo) | July 2026 |
| Nissan - Burleson 300 N Burleson Blvd | IN_CHARGE | DC fast 1 DC fast · CHAdeMO, CCS (J1772 Combo) | January 2026 |
| STAMPEDE HD DCFAST HOG 240 N Burleson Blvd | ChargePoint Network | DC fast 1 DC fast · CCS (J1772 Combo) | July 2026 |
| FVC200HMRES STATION 4 200 Village Creek Pkwy | ChargePoint Network | 2 Level 2 · J1772 (Level 2) | July 2026 |
| FVC200HMRES STATION 1 200 Village Creek Pkwy | ChargePoint Network | 2 Level 2 · J1772 (Level 2) | July 2026 |
| FVC200HMRES STATION 3 200 Village Creek Pkwy | ChargePoint Network | 2 Level 2 · J1772 (Level 2) | July 2026 |
| CT4000 BUR PUBLIC CHAR 2601 S Burleson Blvd | ChargePoint Network | 2 Level 2 · J1772 (Level 2) | July 2026 |
| HMB HOSPITALITY FAIRFIELD INN 201 Pace Alsbury Court | ChargePoint Network | 2 Level 2 · J1772 (Level 2) | July 2026 |
| Nissan - Burleson 300 N Burleson Blvd | Non-networked | 2 Level 2 · J1772 (Level 2) | January 2026 |
Spotted something out of date or missing? Report a correction.
What this means
Level 2 is the standard public and home charger (240V) — a few hours for a full charge, fine for shopping, work, or overnight. DC fast charging is the highway kind: 20–40 minutes to most of a charge, but not every station has it.
Connectors are the plug shape. J1772 is the universal Level 2 plug almost every non-Tesla EV uses. CCS and CHAdeMO are DC fast-charging plugs (CHAdeMO is older, mostly older Nissan Leafs). NACS is Tesla's plug, now the emerging US standard — many newer non-Teslas use it or an adapter.
This page summarizes NREL's own station records and is not a live availability map — a charger listed here can still be busy, broken, or behind a gate. Check the network's app before you rely on a specific plug.
Charging at home in Burleson?
Most EV owners do the bulk of their charging overnight at home on a Level 2 charger. See our home EV charger buying guide for what to look for and how to match a charger to your car's connector.
EV charging near Burleson
Source: U.S. DOE / NREL Alternative Fuels Data Center (AFDC) Station Locator, retrieved July 2026. Public stations only.