VT / Burlington
VT · EV charging
EV charging in Burlington, VT
Here is what NREL's public data shows about EV charging in Burlington, VT. As of NREL AFDC data retrieved July 2026, Burlington has 97 public charging stations with 169 Level 2 ports, including 6 DC fast-charging ports for quick top-ups.
DC fast Level 2 not recently confirmed · click a marker for details, directions & Street View
- 97Public stations
- 169Level 2 ports
- 6DC fast ports
- 3%Ports that are DC fast
⚡ 1 station lists free charging
Stations are operated across 7 networks: ChargePoint Network (83), AMPUP (5), EVMATCH (4), Non-networked (2), and 3 more.
Connectors on record: J1772 (Level 2) at 91 stations; CCS (J1772 Combo) at 5 stations; CHAdeMO at 4 stations; NACS / Tesla at 1 station.
Of these stations, 1 list free charging and 4 are paid, per NREL's pricing field. Pricing is not recorded for the remaining 92. Always confirm current pricing with the network before you charge.
1 station carries a NACS / Tesla connector — relevant if you drive a Tesla or a newer EV that has switched to NACS.
Notable charging stations
The largest sites by port count, DC fast first. Burlington has 97 public stations in all — see the map above.
| Station | Network | Charging | Confirmed |
|---|---|---|---|
| Burlington Hyundai 333 Shelburne Rd | Blink Network | DC fast 2 DC fast · CCS (J1772 Combo) | July 2026 |
| B E CHARGERS BE05 585 Pine St | ChargePoint Network | DC fast 1 DC fast · CHAdeMO, CCS (J1772 Combo) | July 2026 |
| B E CHARGERS BE06 47 S Winooski Ave | ChargePoint Network | DC fast 1 DC fast · CHAdeMO, CCS (J1772 Combo) | July 2026 |
| B E CHARGERS BE19 4 College Street | ChargePoint Network | DC fast 1 DC fast · CHAdeMO, CCS (J1772 Combo) | July 2026 |
| B E CHARGERS BE21 130 Bank Street | ChargePoint Network | DC fast 1 DC fast · CHAdeMO, CCS (J1772 Combo) | July 2026 |
| Cambrian Rise 341 North Ave | EVMATCH | 6 Level 2 · J1772 (Level 2) | ⚠ March 2024 |
| Sunset House 70 Cambrian Way | EVMATCH | 4 Level 2 · J1772 (Level 2) | May 2025 |
| B E CHARGERS BE03 45 Cherry St | ChargePoint Network | 2 Level 2 · J1772 (Level 2) | July 2026 |
| B E CHARGERS BE04 585 Pine St | ChargePoint Network | 2 Level 2 · J1772 (Level 2) | July 2026 |
| B E CHARGERS BE08 81 Carrigan Drive | ChargePoint Network | 2 Level 2 · J1772 (Level 2) | July 2026 |
⚠ 5 of Burlington's 97 stations haven't been re-confirmed by NREL in over 18 months and may be out of service — confirm in the network's app. Spotted something out of date or missing? Report a correction.
What this means
Level 2 is the standard public and home charger (240V) — a few hours for a full charge, fine for shopping, work, or overnight. DC fast charging is the highway kind: 20–40 minutes to most of a charge, but not every station has it.
Connectors are the plug shape. J1772 is the universal Level 2 plug almost every non-Tesla EV uses. CCS and CHAdeMO are DC fast-charging plugs (CHAdeMO is older, mostly older Nissan Leafs). NACS is Tesla's plug, now the emerging US standard — many newer non-Teslas use it or an adapter.
This page summarizes NREL's own station records and is not a live availability map — a charger listed here can still be busy, broken, or behind a gate. Check the network's app before you rely on a specific plug.
Charging at home in Burlington?
Most EV owners do the bulk of their charging overnight at home on a Level 2 charger. See our home EV charger buying guide for what to look for and how to match a charger to your car's connector.
EV charging near Burlington
Source: U.S. DOE / NREL Alternative Fuels Data Center (AFDC) Station Locator, retrieved July 2026. Public stations only.